The contract is for the replacement of steam sterilizers at the Combined Laboratories Facility in Cheyenne, Wyoming. The project includes the removal, relocation, and replacement of three steam sterilizers, as well as the installation of new piping, drains, and stainless-steel components. The contract was awarded to GH Phipps Wyoming for a base bid of $1,675,000.00. The project requires the contractor to attend a mandatory pre-bid meeting and submit a bid bond. The contract documents include various addenda and specifications that must be accepted by the contractor.
• The project involves the replacement of steam sterilizers and associated piping and drains.
• The contractor must install a new pass-through bio gasket and replace the existing steam generator.
• The project requires the removal and disposal of existing casework, equipment, and stainless-steel assemblies.
• The contractor must relocate sinks and associated plumbing and install new lighting in Room 1264.
• The project involves selective demolition, including the infill of an existing door and former pass-through location.