The contract is for the construction and completion of a new 30” butterfly valve installation and damaged pipe repair at the Foothill Water Treatment Plant. The scope of work includes existing tree and fence removal, excavation and shoring of existing buried water line, installation of linestop on 30” CCML water line and 8” hot tap, draining of approximately 1,000 linear feet of 30” water line, demolition, removal, and disposal of CCML pipe to be replaced, procurement and installation of new buried 30” butterfly valve, visual inspection of existing damaged interior pipe section near Castle Oaks Ct, repair of damaged pipe section, disinfect all pipe affected by work, and refill and re-commission 30” water line. The project manager estimate for the project is $300,000, and the bid price from the awarded vendor, Lorang Brothers Construction, is $315,450.00.
• The contract includes the furnishing of all labor, materials, tax, equipment, and services for the construction and completion of the project.
• The project requires the removal of existing trees and fences, and the replacement of fences.
• The project includes the excavation and shoring of existing buried water lines.
• The project requires the installation of a linestop on the 30” CCML water line and an 8” hot tap.
• The project includes the draining of approximately 1,000 linear feet of 30” water line.
• The project requires the demolition, removal, and disposal of CCML pipe to be replaced.
• The project includes the procurement and installation of a new buried 30” butterfly valve.
• The project requires the visual inspection of the existing damaged interior pipe section near Castle Oaks Ct.
• The project includes the repair of the damaged pipe section.
• The project requires the disinfection of all pipe affected by the work.
• The project includes the refill and re-commission of the 30” water line.