Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Foothill WTP 30" Water Line Repair

Awarded contract·Placer County Water Agency·California

Foothill WTP 30" Water Line Repair

Won by Lorang Brothers Construction$315kSingle Award
Contract source

Awarded vendors

  • Lorang Brothers Construction

Description

The contract is for the construction and completion of a new 30” butterfly valve installation and damaged pipe repair at the Foothill Water Treatment Plant. The scope of work includes existing tree and fence removal, excavation and shoring of existing buried water line, installation of linestop on 30” CCML water line and 8” hot tap, draining of approximately 1,000 linear feet of 30” water line, demolition, removal, and disposal of CCML pipe to be replaced, procurement and installation of new buried 30” butterfly valve, visual inspection of existing damaged interior pipe section near Castle Oaks Ct, repair of damaged pipe section, disinfect all pipe affected by work, and refill and re-commission 30” water line. The project manager estimate for the project is $300,000, and the bid price from the awarded vendor, Lorang Brothers Construction, is $315,450.00. • The contract includes the furnishing of all labor, materials, tax, equipment, and services for the construction and completion of the project. • The project requires the removal of existing trees and fences, and the replacement of fences. • The project includes the excavation and shoring of existing buried water lines. • The project requires the installation of a linestop on the 30” CCML water line and an 8” hot tap. • The project includes the draining of approximately 1,000 linear feet of 30” water line. • The project requires the demolition, removal, and disposal of CCML pipe to be replaced. • The project includes the procurement and installation of a new buried 30” butterfly valve. • The project requires the visual inspection of the existing damaged interior pipe section near Castle Oaks Ct. • The project includes the repair of the damaged pipe section. • The project requires the disinfection of all pipe affected by the work. • The project includes the refill and re-commission of the 30” water line.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
2019-03

Contract value

$315,450

The contract value can be estimated based on the bid price from the awarded vendor, Lorang Brothers Construction, which is $315,450.00. This value is slightly higher than the project manager estimate of $300,000. The total contract value is likely to be around $315,450.00, considering the scope of work and the bid price.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Western Virginia Water Authority·Virginia

Top match · 67%

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Gloucester County·Virginia

66% match

IFB 27-012-CJ Clements Avenue Water Line Replacement

Closes 11/16/2026Opened 10/9/2026

City of Holly Grove·Arkansas

65% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

City of Conway·South Carolina

65% match

Highway 905 Water Line Upgrade

Closes 12/3/2026Opened 10/30/2026

City of Farmers Branch·Texas

65% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

City of Thomas·Oklahoma

65% match

City of Thomas Public Water Improvement - Relocation of Public Water Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026

City of Augusta, GA (Augusta Commission)·Georgia

65% match

Cook Road Waterline Replacement

Closes 11/30/2026Opened 10/29/2026

Alabama Bill Nichols State Veterans Home·Alabama

65% match

Nichols Hot Water Line Repair

Closes 11/5/2026Opened 10/28/2026

City of Anderson, SC·South Carolina

64% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/16/2026

Catawba Regional Council of Governments·South Carolina

64% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Lake City and City of Bellechester·Minnesota

64% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

City of Columbus Ohio·Ohio

64% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

City of Riverside·California

64% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Cortez·Colorado

64% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

City of Anderson·South Carolina

64% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/14/2026

North Carolina City of Asheville·North Carolina

64% match

Water Line Repair for Wood Ave and Misc. Insulation Replacement

Closes 11/5/2026Opened 10/1/2026

West County Wastewater·California

64% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

U.S. Department Of Agriculture·North Carolina

63% match

Oconaluftee Waterline Replacement

Closes 11/13/2026Opened 10/6/2026

U.S. Department Of The Interior·California

63% match

Y--LB Lateral Water Line and Facilities Replacement for Wastewater System

Closes 11/11/2026Opened 10/27/2026

Massachusetts Town of Westborough·Massachusetts

63% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Conway·South Carolina

63% match

HWY 905 Water Line Upgrade - RFP

Closes 12/3/2026Opened 10/30/2026

City of DeLand·Florida

63% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

U.S. Department Of Agriculture·Utah

63% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

Utility Board of the City of Key West·Florida

63% match

Specifications for Line 9 Marker Ball and Static Line Repair

Closes 11/2/2026Opened 10/1/2026