The contract is for the Checked Baggage System Upgrades and Optimization at the Tampa International Airport. The contract was awarded to Hensel Phelps Construction Co. and has a total value of $40,636,591. The contract duration is approximately 5 years, from April 5, 2018, to May 19, 2023. The scope of work includes upgrades and optimization of the checked baggage system.
• The contract includes a change order that addresses three items with a total cost of $77,055.
• The contract has a D/W/MBE expectancy of 9.2%.
• The contract was approved by the Hillsborough County Aviation Authority.
• The contractor is required to provide all outstanding obligations to the owner under the contract, including close-out obligations, punch list items, warranty, and correction of defective and non-conforming work.