The City of Bellevue is seeking a contractor to construct non-motorized access to transit on Eastgate Way. The project includes cement concrete curb, gutter, sidewalk, curb ramps, traffic signal modifications, channelization, asphalt paving, traffic control, property restoration, and miscellaneous work. The estimated project cost is between $900,000 and $1,000,000. The contract was awarded through a public bid process, and the bidders' names and prices are listed in the document.
• The project involves construction of cement concrete curb, gutter, sidewalk, and curb ramps.
• The project includes traffic signal modifications, channelization, and asphalt paving.
• The project requires traffic control, property restoration, and miscellaneous work.
• The estimated project cost is between $900,000 and $1,000,000.
• The contract was awarded through a public bid process.