The contract is for the replacement of hot and cold water booster pump systems at the main jail in Sacramento, California. The project includes the furnishing of all labor, materials, equipment, transportation, and services necessary for the replacement of the pump systems, as well as the addition of a cold water manifold in the penthouse and the installation of expansion tanks for the hot and cold water systems. The contract was awarded to TNT Industrial Contractors, Inc. for a total bid amount of $829,999. The project is expected to be completed within a certain timeframe, although the exact duration is not specified in the contract documents. The contract includes a base bid and an additive bid alternate, and the county reserves the right to award the contract to the lowest responsible and responsive bidder. Some key points to consider include:
• The project requires a C-36 license, and the engineer's estimate is $690,000.
• The bid submission date was December 22, 2016, and the bid opening date was December 22, 2016, at 2:00 P.M.
• The contract includes a mandatory pre-bid conference and walk-through, which was held on November 29, 2016, and December 1, 2016.
• The contract requires the contractor to submit a bid guaranty, which must be a bidder's bond, a certified check, or a cashier's check payable to the Treasurer of Sacramento County.
• The contract includes an affidavit of non-collusion, which requires the bidder to declare that the bid is genuine and not collusive or sham.