The contract is for the replacement of the Warm Beach Water System, which includes the installation of new water mains, fire hydrants, and other associated infrastructure. The project is estimated to cost $1,175,000.00 and was awarded to SRV Construction, Inc. The scope of work includes the installation of approximately 4,100 lineal feet of 12-inch diameter water main, 90 lineal feet of 8-inch diameter water main, and 20 lineal feet of 6-inch diameter water main, as well as the installation of 7 new fire hydrant assemblies and appurtenances and 2 combination air vacuum release assemblies.
• The project includes the installation of 44 water services, asphalt trench patching, asphalt restoration overlay, private asphalt, concrete and gravel driveway removal and restoration, erosion control, and landscape/surface restoration.
• The primary purpose of the project is to replace aging water system infrastructure.
• The location of the work commences at the intersection of 92nd Ave. NW and 176th St. NW and continues north along 92nd Ave. NW/Marine Dr. in the eastern roadway shoulder public right-of-way and ends at the intersection of Marine Dr. and Railroad Ave., near the City of Stanwood, in Snohomish County, Washington.