Thayer Power and Communication Line Construction Co LLC
CCSI Networks, LLC
J.W. Didado Electric, LLC
The Fishel Company
Description
The County of Summit, Ohio is seeking qualification statements from design-build firms for the design and construction of an approximately 125-mile underground fiber optic network. The project is expected to start in 2022 and be completed by 2024. The Selection Committee has determined seven qualified firms to receive the RFP, which will be released in January 2022. The firms will be evaluated based on their competence, ability, and past performance. The key aspects of the project include the installation of fiber, conduit, and other structures within the public right-of-way and on properties identified in the plans and specifications.
• The project involves the design and construction of a fiber optic network in Summit County, Ohio.
• The network will connect all 31 communities in the county.
• The project is expected to start in 2022 and be completed by 2024.
• The Selection Committee has determined seven qualified firms to receive the RFP.
• The firms will be evaluated based on their competence, ability, and past performance.