The contract is for the replacement of the existing boat barrier system for boater safety on the reservoir above the Cowlitz Falls Hydroelectric Project. The contractor is required to provide all supervision, labor, materials, consumables, equipment, tools, and incidentals necessary for the project. The bid submission date was August 22, 2024, and the estimated value of the contract is $1,830,000.00. Some key points of the project include:
• The replacement of the existing boat barrier system
• The provision of all necessary supervision, labor, materials, and equipment
• The requirement for the contractor to sign and deliver a completed Non-Disclosure Form before attending the pre-submittal meeting
• The presence of a pre-submittal meeting on July 31, 2024, at 10:00 AM
• The location of the project at the Cowlitz Falls Hydroelectric Project, 1379 Falls Rd, Randle, WA 98377