The contract is for the Dumpling Diversion and Rock Creek Diversion Fish Passage and Screening Project, located at Pitchfork Ranch, 20A RD 5 RU, Meeteetse, Wyoming 82433. The project involves reconstruction of two irrigation diversions to provide fish passage and prevent entrainment. The contract was awarded to River Masters Environmental Consulting and Barnum Inc. The total bid amount for River Masters Environmental Consulting is $344,060.00, and for Barnum Inc. it is $312,033.75. The contract requires a bid deposit in the amount of 10% of the total bid, which shall be in the form of a bid bond, cashier's check, or certified check.
• The project includes the reconstruction of two irrigation diversions, Dumpling Diversion and Rock Creek Diversion.
• The project requires a mandatory pre-bid meeting, which was held on August 22, 2024.
• The contract has two addendums, Addendum #1 and Addendum #2.
• The contract requires a bid bond, which shall be in the form of a bid bond, cashier's check, or certified check.
• The contract has a 5% Wyoming preference.