The contract is for the replacement of a fuel oil boiler with an electric boiler, as well as the replacement of the HVAC controls system, at the Zach Gordon Youth Center. The work includes the installation of a new hot water heater, circulation pumps, and other associated boiler plant equipment. The contract also includes HAZMAT abatement work. The bid amount is $397,000.00.
• The project involves the replacement of a fuel oil boiler with an electric boiler
• The replacement of the HVAC controls system is also included
• The work includes the installation of a new hot water heater and circulation pumps
• HAZMAT abatement work is also part of the contract
• The bid amount is $397,000.00