The Metropolitan District is undertaking the sixth phase of its Accelerated Water Main Replacement Program, which involves the replacement of approximately 12,000 linear feet of 8‑ to 12‑inch ductile‑iron water main across member towns in Connecticut. The scope includes full removal of existing pipe, installation of new ductile‑iron pipe, service reconnections, renewals, associated appurtenances, and temporary restoration of paved and unpaved surfaces. A mandatory pre‑bid conference was held on February 15, 2024, and bids were required to be submitted by March 13, 2024. The contract was officially awarded on June 27, 2024.
• Scope: 12,000 ft of 8–12″ ductile‑iron water main replacement, including service connections and site restoration.
• Procurement: Open invitation to bid (ITB) with a mandatory pre‑bid conference.
• Timeline: Bid submission deadline = Mar 13 2024; award = Jun 27 2024; project execution dates not disclosed.