Description
This municipal contract concerns the Phase 3 capacity upgrades for Basins 10 and 14 in Fort Smith, Arkansas. The scope encompasses a comprehensive suite of civil‑utility construction tasks—including site preparation, erosion control, traffic management, extensive trenching and backfill, installation of 12‑inch and 24‑inch sewer pipes (HDPE and concrete), manhole construction and repair, riprap placement, concrete paving, asphalt surfacing, landscaping, and fence removal/reconstruction. The bid tabulation reports a total combined bid amount of $5,083,072.50, reflecting unit‑price pricing across 53 line items. A 5 % local‑firm preference was applied per City Ordinance 50‑15, though it did not alter the total. The document was compiled on March 14 2024 and certified on March 18 2024, but no award, start, or completion dates are provided. Only one bidder, Crawford Construction Company, is identified in the summary.
• Comprehensive water‑utility infrastructure upgrade (sewer pipe, manholes, drainage, road work).
• Itemized unit‑price bidding covering earthwork, pipe installation, structural works, and site finishing.
• Total bid value approximately $5.08 million; no award or contract term details disclosed.