Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arkansas guideArkansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arkansas
  4. ›Construction
  5. ›17-19-C1ː Basin 12 Capacity Improvements

Awarded contract·City of Fort Smith·Arkansas

17-19-C1ː Basin 12 Capacity Improvements

$578kSingle Award
Contract source

Description

This contract concerns the Basin 12 Capacity Improvements project for the City of Fort Smith’s utility infrastructure. The scope includes extensive underground work such as site preparation, trench safety systems, traffic control, CCTV inspection of existing 20‑inch sewer mains, installation of cured‑in‑place pipe (CIPP) lining, replacement of manhole drop assemblies, and construction of both cementitious and fiberglass manhole liners in various sizes and depths. Unit‑price bids were submitted by two contractors, with total estimated costs (after a 5 % local‑preference discount) of roughly $578 K. The project is a municipal utility upgrade that will enhance sewer capacity and reliability, requiring specialized trench‑less rehabilitation techniques and compliance with confined‑space safety standards. • Bid tabulation dated June 27 2019, showing two competing vendors and detailed line‑item pricing. • Work includes CIPP pipe lining, manhole relining, and associated traffic and safety measures. • Total contract value (post‑preference) estimated at ≈ $578 K, with a mandatory performance and payment bond.

Attached files

Key dates

Contract modified
6/27/2019

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
17-19-C1

Contract value

$578,038

The bid tabulation lists a “Total Base Bid Including 5 % Preference” of $577,988–$578,038. Taking the higher figure as the final contract amount, the estimated contract value is approximately $578 K. This estimate reflects the summed unit‑price items for trench‑less pipe rehabilitation, manhole lining, and associated site work, after applying the city‑resident 5 % preference discount. No other cost elements (e.g., bonds, contingencies) are shown, so the figure represents the primary construction spend.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Panama City·Florida

Top match · 66%

SRF Area P-12 Improvements

Closes 11/13/2026Opened 10/7/2026

Irvine Ranch Water District·California

65% match

Wells 6, 12, 14, and 15 Site Improvements

Closes 11/18/2026Opened 10/15/2026

Brazos Valley·Texas

65% match

Well 6 Capacity Enhancement

Closes 11/12/2026Opened 10/21/2026

Inland Empire Utilities Agency·California

64% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026

U.S. Department Of The Interior·Utah

64% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

U.S. Department Of Defense·Louisiana

63% match

CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R

Closes 11/13/2026Opened 10/19/2026

Upper Occoquan Service Authority·Virginia

63% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Fredonia·Kansas

62% match

Distribution System Improvements - Fredonia, KS

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

62% match

CHASSIS,VME,12 SLOT

Closes 11/25/2026Opened 10/27/2026

Manatee County - Purchasing Division·Florida

62% match

LIFT STATION 9-A FORCE MAIN EXTENSION

Closes 11/20/2026Opened 10/9/2026

West County Wastewater·California

62% match

Secondary Sedimentation Basins Upgrades Project - Short-term Improvements for Basins (1) & (2)

Closes 12/16/2026Opened 10/27/2026

U.S. Department Of Energy·California

62% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

City of Salina·Kansas

62% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Charleston County School District·South Carolina

62% match

D23 Capacity Improvements

Closes 11/12/2026Opened 10/14/2026

City of Charlotte·North Carolina

62% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

The University of North Carolina·North Carolina

62% match

Parking Lot RS-12 Resurfacing and Safety Improvements

Closes 11/3/2026Opened 1/9/2025

U.S. Department Of Defense·Texas

62% match

FY26 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS

Closes 9/10/2027Opened 9/10/2026

City of Charlotte·North Carolina

62% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

City of Braintree·Massachusetts

62% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

61% match

29--VALVE,RELIEF,FUEL, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/3/2026

Alaska Department of Environmental Conservation·Alaska

61% match

Aleutian Homes Phase VII Water and Sewer Determination of Categorical Exclusion

Rolling / TBD closeOpened 8/17/2026

City of Alexandria·Louisiana

61% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

State University of New York (SUNY)·New York

61% match

Replace Select Catch Basins

Closes 11/10/2026Opened 10/15/2026

City of Shawnee·Kansas

61% match

Ordinance No. 3494

Closes 7/16/2031Opened 7/16/2024

Orange County Sanitation District, CA·California

61% match

J-124 (RFI), DIGESTER GAS FACILITIES REHABILITATION

Closes 11/15/2026Opened 8/25/2026