Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Water and Wastewater
  5. ›17-ES-008 - Boston Road and S Riverside Dr. Stormwater…

Awarded contract·City of Edgewater·Florida

17-ES-008 - Boston Road and S Riverside Dr. Stormwater Improvements

Won by Bone Dry Dewatering, LLC$190kAwarded 7/17/2017Single Award
Contract source

Awarded vendors

  • Bone Dry Dewatering, LLC

Description

The City of Edgewater awarded a municipal storm‑water improvement contract to replace and upgrade drainage infrastructure along Boston Road and South Riverside Drive. The work includes design‑build installation of Type “C” inlets, HDPE exfiltration trenches, reinforced concrete pipe, swales, roadway and sidewalk reconstruction, utility coordination, erosion‑control measures, and post‑construction testing. The contract was competitively bid in May‑June 2017, evaluated in late June, and formally awarded by the City Council on 17 July 2017. The scope is delivered under a unit‑price schedule with performance and payment bonds, and compliance with Florida’s Trench Safety Act and environmental permits is required. • Primary construction items: storm‑structure inlets, 18‑in. HDPE exfiltration trenches, 15‑in. RCP, swales, asphalt/open‑cut road repair, concrete sidewalk/driveway, sodding, water‑service adjustments. • Required permits & controls: NPDES storm‑water permit, silt‑fence/turbidity‑curtain, trench‑box safety, asbestos‑cement water‑main handling. • Project schedule: bids due 13 Jun 2017; award 17 Jul 2017; NTP within 60 days of contract execution; substantial completion within 60 calendar days of NTP, with liquidated damages of $500/day thereafter.

Attached files

Key dates

Bids closed
6/19/2017
Intent to award
7/17/2017
Awarded
7/17/2017
Contract modified
5/31/2017

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
17‑ES‑008

Contract value

$190,000

The Addendum 2 includes an Engineer’s estimate of $203,802.50, and the final bid tabulation shows the awarded vendor’s total bid at $175,669.24 (lowest) with the council ultimately selecting Bone Dry Dewatering, LLC (no amount disclosed). Given the range of bids ($175 k–$230 k) and the engineer’s estimate, a reasonable ballpark for the contract value is roughly $190,000. This accounts for the unit‑price items, material quantities (≈ 380 LF of HDPE trench, ≈ 100 LF of RCP, 175 SY driveway, 240 SY sidewalk, etc.), and typical municipal overhead.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Charlotte·North Carolina

Top match · 71%

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Charlotte·North Carolina

70% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

Town of South Hill·Virginia

70% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

City of Charlotte·North Carolina

70% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

Village of North Palm Beach·Florida

70% match

Buoy Road Stormwater

Closes 11/10/2026Opened 10/8/2026

City of Charlotte·North Carolina

70% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Charlotte·North Carolina

70% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Sterling Heights·Michigan

69% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

James City County·Virginia

69% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026

City of Charlotte·North Carolina

69% match

1206 Georgetown Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/15/2027

City of Coronado·California

69% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

Nevada Government·Nevada

69% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Lowell·Massachusetts

69% match

Appleton Church Streets Project

Closes 11/24/2026Opened 10/28/2026

City of Charlotte·North Carolina

69% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of Charlotte·North Carolina

69% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

City of South Miami·Florida

69% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

City of Cape Canaveral·Florida

69% match

Stormwater Pilot Project

Closes 11/12/2026Opened 10/15/2026

Massachusetts Department of Transportation·Massachusetts

68% match

616396 DISTRICT 1 Scheduled and Emergency Drainage, Slope, and Roadway Repairs/Improvements at Var

Closes 11/17/2026Opened 10/26/2026

Catawba Regional Council of Governments·South Carolina

68% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Charles County Government·Maryland

68% match

Stormwater Facilities Task Order Services

Closes 11/5/2026Opened 10/8/2026

City of Charlotte·North Carolina

68% match

Crestmont Drive (4724) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/10/2026

City of Charlotte·North Carolina

68% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of Charlotte·North Carolina

68% match

2500 Briargrove Dr. Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/1/2026

City of Charlotte·North Carolina

68% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

City of Charlotte·North Carolina

68% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027