Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Waste Removal and Collection
  5. ›Transfer Station Master Plan (#25PW003)

Awarded contract·City of Prescott·Arizona

Transfer Station Master Plan (#25PW003)

Won by J.R. Miller & Associates, Inc.$350kAwarded 5/27/2025Single Award
Contract source

Awarded vendors

  • J.R. Miller & Associates, Inc.

Description

The City of Prescott awarded a contract to develop a comprehensive Master Plan for its solid‑waste Transfer Station (CIP 2408‑001). The scope includes site‑planning, conceptual and preliminary design, topographic surveying, utility coordination, environmental mitigation recommendations, and public/council presentation support. The work will culminate in a final master‑plan package delivered in multiple design phases (30 % through 100 %). The contract is initially for one year, with the possibility of up to four additional one‑year extensions. The award reflects a qualifications‑based selection (RSOQ) and does not contain a fixed price; the city anticipates a multi‑million‑dollar design effort. • Scope: site layout, new facility design, utility/infrastructure studies, environmental mitigation, survey & mapping, public outreach. • Timeline: award 05/27/2025, bid opening 01/09/2025, contract term 1 year (extendable). • Vendor: J.R. Miller & Associates, Inc. as the sole awardee.

Attached files

Key dates

Bids closed
1/9/2025
Intent to award
5/27/2025
Awarded
5/27/2025
Starts
5/27/2025
Duration
1 year

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Utilities and Waste Management
NAICS
541330
Solicitation №
25PW003

Contract value

$350,000

The documents do not disclose a contract dollar amount. However, the 2005 basis‑of‑design memo for a similar Transfer Station Master Plan projected construction costs of $3.02 M–$4.02 M, with $300 k–$400 k earmarked as bid alternates. Assuming the 2025 master‑plan effort (survey, design, environmental studies, and deliverables) represents roughly 10‑15 % of full construction costs, a reasonable ballpark for the design‑services contract is between $300,000 and $600,000. Considering inflation and the expanded scope (multiple design phases, public outreach, and optional extensions), a mid‑range estimate of $350,000 is justified.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Connecticut Northwest Hills Council of Gov.·Connecticut

Top match · 68%

Torrington Transfer Station: MSW & Recycling Management & Operations

Closes 12/15/2026Opened 11/4/2025

Southern California Regional Rail Authority·California

68% match

Systemwide Signage and Wayfinding Master Plan

Closes 12/2/2026Opened 10/29/2026

West Liberty University·West Virginia

68% match

27-0005 - Campus Master Plan & Facility Assessment Services

Closes 11/4/2026Opened 9/21/2026

Connecticut City of Norwalk·Connecticut

68% match

BLDG2026-2 Transfer Station Building and Property Evaluation

Closes 11/3/2026Opened 10/16/2026

Connecticut Northwest Hills Council of Gov.·Connecticut

67% match

Torrington Transfer Station: MSW & Recycling Management & Operations

Closes 12/15/2026Opened 11/4/2025

West Liberty University·West Virginia

67% match

27-0005 - Campus Master Plan & Facility Assessment Services

Closes 11/4/2026Opened 9/21/2026

Connecticut Northwest Hills Council of Gov.·Connecticut

67% match

Torrington Transfer Station: MSW & Recycling Management & Operations

Closes 12/15/2026Opened 11/4/2025

Metropolitan Council·Minnesota

67% match

Notice of Intent to Solicit Blue Line Franklin Station Renovation

Closes 11/20/2026Opened 10/14/2026

Memphis-Shelby Airport Authority·Tennessee

67% match

Information Technology Master Plan

Closes 11/2/2026Opened 9/22/2026

City of Keene·New Hampshire

67% match

Transfer Station Climate Control Project

Closes 11/23/2026Opened 10/22/2026

Washington Metropolitan Area Authority (WMATA)·District of Columbia

67% match

ADVANCE NOTICE: Rail Modernization Program

Closes 9/30/2027Opened 7/7/2026

Massachusetts City of Newburyport·Massachusetts

66% match

RFP No. 27-05: Demolition, Development, Construction & Lease of a Telecommunications Tower Facility

Closes 11/20/2026Opened 10/28/2026

City of Fremont·Nebraska

66% match

Waste Transfer Station RFP

Closes 11/6/2026Opened 8/7/2026

Metropolitan Council·Minnesota

66% match

TVM Relocation 46th Street and Nicollet Mall Stations (Contracting - with Small Business Goal)

Closes 11/4/2026Opened 10/2/2026

General Services, NYS Office of·New York

66% match

47776CHPE: Renovate Train Depot

Closes 12/2/2026Opened 10/21/2026

City of Wilton Manors·Florida

66% match

Lift Station No. 1 Replacement

Closes 11/2/2026Opened 9/30/2026

City of DeLand·Florida

66% match

Lift Station #10 Relocation

Closes 11/18/2026Opened 10/13/2026

City of Charlotte·North Carolina

65% match

Center Lighting Vault Relocation

Rolling / TBD closeOpened 3/15/2027

Delaware Valley Regional Planning Commission·Pennsylvania

65% match

Transportation Facilities Master Plan (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/2/2026Opened 10/19/2026

South Dakota State Government·South Dakota

65% match

Housing Master Plan

Closes 11/23/2026Opened 10/19/2026

City of Charlotte·North Carolina

65% match

Baggage Handling System Transfer Line (TX3)

Rolling / TBD closeOpened 6/8/2026

City of Charlotte·North Carolina

65% match

Ashe Plantation Lift Station 2

Rolling / TBD closeOpened 5/1/2027

City of Keene·New Hampshire

65% match

Transfer Station Climate Control Project

Closes 11/23/2026Opened 10/22/2026

Napa Valley Transportation Authority·California

65% match

South Napa County Station Area Plan

Closes 11/6/2026Opened 10/6/2026

City of Wilton Manors·Florida

65% match

Lift Station No. 7 Replacement

Closes 11/23/2026Opened 10/22/2026