The contract is for the expansion of the Terminal A Security Checkpoint at the Sacramento International Airport. The work includes increasing the second floor platform by 1,300 square feet, re-configuring the exit corridor, and replacing two existing escalators with new ones. The estimated construction cost for the base bid is $2,200,000. The contract was awarded to Bobo Construction, Inc. with a bid of $1,688,000.
• The contract is for a construction project at the Sacramento International Airport.
• The work includes expansion of the Terminal A Security Checkpoint.
• The estimated construction cost for the base bid is $2,200,000.
• The contract was awarded to Bobo Construction, Inc. with a bid of $1,688,000.
• The project requires compliance with the Airport Sponsor Assurances and any subsequent revisions or updates.