Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Redwood City Grade Crossing Improvements

Awarded contract·San Mateo County Transit District (Peninsula Corridor Joint Powers Board)·California

Redwood City Grade Crossing Improvements

Won by Balfour Beatty Infrastructure, Inc.$824kSingle Award
Contract source

Awarded vendors

  • Balfour Beatty Infrastructure, Inc.

Description

The Redwood City Grade Crossing Improvements project involves the implementation of safety improvements at three grade crossings in the Redwood City portion of Caltrain's corridor. The project includes the installation of pavement markers and markings, pedestrian channelization with guard railings, traffic signals and signage, and vehicle and pedestrian gates. The contract was awarded to Balfour Beatty Infrastructure, Inc. for a total cost of $824,350. The project requires the contractor to perform at least 40% of the work with their own organization. • The project is located in Redwood City, California • The contract was awarded on August 3, 2017 • The project requires the contractor to hold a valid California State Contractor's License, Classification "A" - General Engineering • The contractor is required to ensure that all subcontractors working on the project hold valid licenses suitable for their trade

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
17-J-C-043

Contract value

$824,350

The contract value is explicitly stated as $824,350. This value is based on the bid submitted by Balfour Beatty Infrastructure, Inc. and accepted by the San Mateo County Transit District.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Sacramento·California

Top match · 69%

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

City of Seattle·Washington

69% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

City of Santa Cruz·California

67% match

HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

Closes 11/5/2026Opened 10/21/2026

City of Pasadena·California

66% match

HSIP Cycle 11 Pedestrian Crossing Enhancements

Closes 11/19/2026Opened 10/26/2026

City of Vernon·California

66% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

California Department of Transportation·California

65% match

Clairemont drive bridge deck repair.

Closes 12/1/2026Opened 10/5/2026

Texas City of San Antonio·Texas

65% match

George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

Town of Westwood·Massachusetts

65% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

California Department of Transportation·California

65% match

Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.

Closes 11/18/2026Opened 10/5/2026

NYS East Fishkill, Town of·New York

65% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Doge City·Kansas

65% match

Trail St & Overpass CCLIP (closed 10/20)

Rolling / TBD closeOpened 9/15/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Elk Grove·California

64% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

City of Morgan Hill·California

64% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

City of Ontario·California

64% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Seattle·Washington

64% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026

City of Oakland Park·Florida

64% match

Professional Planning and Engineering Consulting Services for NE 36th Street Railroad Crossing Elimination (RCE) Project

Closes 12/3/2026Opened 10/27/2026

Town of Camp Verde·Arizona

64% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

City of Seattle·Washington

64% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Oregon Department of Transportation·Oregon

64% match

US101 At Market Ave Enhanced Crossing Project

Closes 11/10/2026Opened 10/26/2026

California Department of Transportation·California

64% match

Realign highway and add truck climbing lane.

Closes 11/5/2026Opened 9/14/2026

City of Redlands·California

64% match

Traffic Signal Head Improvements

Closes 11/16/2026Opened 10/22/2026