Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Terminal Apron Reconstruction

Awarded contract·Snohomish County·Washington

Terminal Apron Reconstruction

$9MAwarded 3/22/2023Single Award
Contract source

Description

This public‑works solicitation calls for the complete reconstruction of a terminal apron at a Snohomish County airport facility. The scope includes demolition, excavation, sub‑grade work, removal of existing asphalt, installation of new pavement (both HMA and concrete), utility relocation, drainage improvements, lighting, signage, and associated site‑restoration activities. The engineer’s estimate totals approximately $8.28 M, while two bidders submitted total proposals of $9.34 M (Stacy & Witbeck) and $10.85 M (Strider Construction). The project is funded in part by the Passenger Facility Charge (PFC) and is subject to Washington State sales tax (10.5%). Bids were due March 14, 2023, with the bid opening on the same day and an award date recorded as March 22, 2023. No contract award has been confirmed, and the county retains the right to reject any or all bids. • Major civil works: demolition, earthwork, pavement removal/replacement, concrete structures. • Utilities & infrastructure: storm‑drain, conduit, lighting, signage, fencing, and erosion control. • Funding: PFC‑funded Schedule 1 and non‑PFC Schedule 2, both taxed at 10.5 % WA sales tax. • Procurement: Open competition with two qualified bidders; award not yet declared.

Attached files

Key dates

Bids closed
3/14/2023
Intent to award
3/22/2023
Awarded
3/22/2023

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
238150
Solicitation №
PW-23-004SB

Contract value

$9,000,000

The engineer’s estimate for the project is explicitly listed as $8,004,830 (Schedule 1) plus $274,045 (Schedule 2), totaling $8,278,875. Since the two submitted bids are higher ($9.34 M and $10.85 M), the final contract value will likely fall near the lower end of that range, assuming the county selects the lower bid or negotiates a price near the estimate. A reasonable ball‑park for the awarded contract is therefore about $9 million, acknowledging that the final amount could be slightly higher if the higher bid is chosen or if change orders are added.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Hillsborough County Aviation Authority·Florida

Top match · 68%

GENERAL AVIATION APRON REHABILITATION (TPA)

Closes 11/16/2026Opened 9/29/2026

NYS Niagara Frontier Transportation Authority·New York

68% match

BNIA – TERMINAL RECONSTRUCTION – INTERIOR

Closes 11/25/2026Opened 10/20/2026

State of Hawaii Department of Transportation – Airports·Hawaii

67% match

CM1530-33 Apron Reconstruction, Phase 1, Kahului airport

Closes 11/16/2026Opened 10/2/2026

City of Charlotte·North Carolina

67% match

FBO Apron Expansion & Rehab

Rolling / TBD closeOpened 10/13/2026

Jacksonville Aviation Authority·Florida

66% match

JAA JAX Concourse B Apron Phase 2

Closes 11/17/2026Opened 10/15/2026

Raleigh Durham Airport Authority·North Carolina

66% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Massachusetts Port Authority (Massport)·Massachusetts

65% match

Terminal C Redevelopment Logan International Airport

Closes 11/6/2026Opened 10/21/2026

Georgia Decatur County Board of Commissioners·Georgia

65% match

Rehab Terminal Apron

Closes 11/5/2026Opened 10/5/2026

Tampa International Airport·Florida

65% match

General Aviation Apron Rehabilitation

Closes 11/16/2026Opened 9/30/2026

Goodwyn Mills Cawood·Alabama

65% match

Apron Expansion at Evergreen Regional Airport at Middleton Field

Closes 11/20/2026Opened 10/28/2026

City of Charlotte·North Carolina

64% match

Terminal Roof and AHU Replacements

Closes 1/1/2027Opened 8/12/2026

Port of Lake Charles·Louisiana

64% match

Bulk Terminal No. 1 Junction House Rehabilitation

Closes 11/19/2026Opened 10/16/2026

Port of Portland·Oregon

64% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

Jacksonville Aviation Authority·Florida

63% match

ITB C-900 JAA JAX Concourse B Apron Phase 2

Closes 11/17/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

63% match

KITE TERMINAL CONSO

Closes 11/5/2026Opened 10/8/2026

City of Lynchburg·Virginia

63% match

TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

Jacksonville Port Authority·Florida

63% match

Repair and Replacement of Four (4) Canopies for Jacksonville Port Authority, Dames Point Cruise Terminal

Rolling / TBD closeOpened 10/6/2026

Georgia Turner County Board of Commissioners·Georgia

62% match

Turner County Airport � Apron/Stub Taxiway Rehabilitation Project

Closes 11/17/2026Opened 10/16/2026

Houston Airport System·Texas

62% match

IAH Terminal D HVAC Efficiency Upgrades

Closes 11/12/2026Opened 9/11/2026

Vantage Group - Boston Logan Terminal C Redevelopment·Massachusetts

62% match

Construction Management‑at‑Risk (CMR) Services – Terminal C Redevelopment, Boston Logan International Airport

Closes 11/6/2026Opened 10/21/2026

Office of the Adjutant General - North Dakota Army National Guard - Directorate of Installations and Environment·North Dakota

62% match

Concrete Apron Sealing and Repairs, Avenue E, Camp (Project 2620)

Closes 11/4/2026Opened 10/13/2026

Port of Portland·Oregon

62% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

SC Ports Authority·South Carolina

62% match

SCPA - Wando Welch Terminal, RFP for Engineering Services - Pavement Design

Closes 11/6/2026Opened 10/6/2026

CHA Consulting, Inc.·Indiana

62% match

EVANSVILLE-VANDERBURGH AIRPORT AUTHORITY DISTRICT REGIONAL AIRPORT – FLIGHTLINE DRIVE UTILITY EXTENSION

Closes 12/2/2026Opened 10/29/2026

SC Ports Authority·South Carolina

62% match

SCPA - Wando Welch Terminal, RFP for Engineering Services - Pavement Design

Closes 11/6/2026Opened 10/6/2026