This public‑works solicitation calls for the complete reconstruction of a terminal apron at a Snohomish County airport facility. The scope includes demolition, excavation, sub‑grade work, removal of existing asphalt, installation of new pavement (both HMA and concrete), utility relocation, drainage improvements, lighting, signage, and associated site‑restoration activities. The engineer’s estimate totals approximately $8.28 M, while two bidders submitted total proposals of $9.34 M (Stacy & Witbeck) and $10.85 M (Strider Construction). The project is funded in part by the Passenger Facility Charge (PFC) and is subject to Washington State sales tax (10.5%). Bids were due March 14, 2023, with the bid opening on the same day and an award date recorded as March 22, 2023. No contract award has been confirmed, and the county retains the right to reject any or all bids.
• Major civil works: demolition, earthwork, pavement removal/replacement, concrete structures.
• Utilities & infrastructure: storm‑drain, conduit, lighting, signage, fencing, and erosion control.
• Funding: PFC‑funded Schedule 1 and non‑PFC Schedule 2, both taxed at 10.5 % WA sales tax.
• Procurement: Open competition with two qualified bidders; award not yet declared.