Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Engineering Services
  5. ›Design and Engineering Services, O’Reilly Acres Access…

Awarded contract·Snohomish County·Washington

Design and Engineering Services, O’Reilly Acres Access Bridge & Abutment Replacement

Won by KPFF, Inc.$250kAwarded 8/25/2025Single Award
Contract source

Awarded vendors

  • KPFF, Inc.

Description

This procurement seeks professional design and engineering services for the replacement of the O’Reilly Acres access bridge and its abutments in Snohomish County, Washington. The scope includes conceptual and detailed design, structural analysis, and preparation of construction documents for a new bridge and associated abutments. The agency evaluated two qualified firms, scoring them on signature compliance, experience, references, methodology, and sustainability, ultimately recommending KPFF, Inc. as the awardee. The RFQ was issued in July 2025, with bids due in early August, and the award recommendation was signed on 25 August 2025. • Scope: Bridge‑replacement design and engineering (structural, civil, and related disciplines). • Evaluation: Multi‑criteria scoring (signatures, qualifications, references, methodology, sustainability). • Outcome: KPFF, Inc. recommended for award; contract value not disclosed.

Attached files

Key dates

Bids closed
8/7/2025
Intent to award
8/25/2025
Awarded
8/25/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
RFQ-25-0518BC

Contract value

$250,000

No explicit monetary amount is disclosed. Typical design‑engineering contracts for a small to medium bridge replacement in Washington State range from $150,000 to $400,000, depending on project complexity, required deliverables, and consultant reputation. KPFF, Inc. is a well‑established firm, suggesting the higher end of that band is plausible. Assuming a mid‑size bridge with moderate site constraints, a reasonable estimate is roughly $250,000 for the complete design and engineering package. This figure accounts for conceptual design, detailed structural analysis, construction‑document preparation, and associated project management services.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Georgia Cobb County Department of Transportation·Georgia

Top match · 74%

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Cobb County, GA·Georgia

73% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Nevada County·California

73% match

Rock Creek Road at Rock Creek Bridge – Engineering Design Services

Closes 11/30/2026Opened 10/15/2026

Cuyahoga County·Ohio

73% match

RQ16425: Highland Road Bridge Engineering Services

Closes 11/5/2026Opened 10/5/2026

City of Cedar Rapids·Iowa

73% match

8th Ave Bridge Replacement & Floodwalls Construction Engineering & Inspection Services

Closes 11/10/2026Opened 10/20/2026

County of Ocean·New Jersey

72% match

Bridge Design Services, Various Locations throughout Ocean County

Closes 11/10/2026Opened 10/22/2026

Georgia City of Chattahoochee Hills·Georgia

72% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

Massachusetts City of Taunton·Massachusetts

72% match

Design Services for Danforth Street Bridge

Closes 11/12/2026Opened 10/14/2026

City of Cedar Rapids·Iowa

72% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cape Coral, FL·Florida

72% match

Construction, Engineering And Inspection (CEI) Services For The Sands Boulevard And Surfside Boulevard Bridge Repair Projects

Closes 11/6/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

72% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

72% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

City of Cedar Rapids·Iowa

72% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Town of Camp Verde·Arizona

72% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Oregon Department of Transportation·Oregon

71% match

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

Georgia City of Atlanta·Georgia

71% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

Georgia Henry County Board of Commissioners·Georgia

71% match

(RFQ) 27-23, Engineering and Design Services for Gardner Road Bridge

Closes 11/19/2026Opened 10/22/2026

Massachusetts Department of Transportation·Massachusetts

71% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

Henry County·Georgia

71% match

(RFQ) 27-23, Engineering and Design Services for Gardner Road Bridge

Closes 11/19/2026Opened 10/22/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Georgia Bulloch County Board of Commissioners·Georgia

71% match

Airport Consulting Services - Engineering

Closes 12/3/2026Opened 10/29/2026

City of St. Louis·Missouri

71% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

City of Charlotte·North Carolina

71% match

Morris Field Bridge Replacement

Rolling / TBD closeOpened 5/1/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026