Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›First Street Substation Bank 1 Transformer Regasketing and…

Awarded contract·City of Richland·Washington

First Street Substation Bank 1 Transformer Regasketing and Painting (Restrictive Bid)

Won by Transfluid Services +1 more$191kMultiple Award
Contract source

Awarded vendors

  • Transfluid Services
  • Specialty Engineering, Inc.

Description

The contract is for the regasketing and painting of a 15/20/25 MVA Westinghouse Power Transformer at the 1st Street Substation Bank 1. The engineer's estimate for the project is between $96,000 and $132,000. The contract was awarded to Transfluid Services and Specialty Engineering, Inc. The project requires the furnishing of all materials, labor, tools, and equipment necessary to perform the work. • The project consists of regasketing, oil testing, and painting the transformer. • The engineer's estimate is between $96,000 and $132,000. • The contract was awarded to Transfluid Services and Specialty Engineering, Inc. • The project requires the furnishing of all materials, labor, tools, and equipment necessary to perform the work.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Industry
Construction
NAICS
237990
Solicitation №
23-0048

Contract value

$191,000

Based on the bid tabulation, the contract value can be estimated as follows: Transfluid Services bid $183,000, and Specialty Engineering, Inc. bid $198,921. Since the engineer's estimate is between $96,000 and $132,000, it is likely that the contract value will be closer to the lower end of this range. However, considering the bids received, the contract value is likely to be around $183,000 to $198,921. A reasonable estimate would be to take the average of the two bids, which is ($183,000 + $198,921) / 2 = $190,960.50. Rounding this to the nearest thousand, the estimated contract value is $191,000.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Rochester Public Utilities·Minnesota

Top match · 71%

Power Transformer - Zumbro River Substation

Closes 11/23/2026Opened 10/13/2026

NYS MTA - Metro-North Railroad·New York

70% match

REPLACEMENT OF SEVEN (7) POWER SUBSTATION ROOFS

Closes 11/17/2026Opened 10/2/2026

City of St. Charles·Illinois

68% match

Substation Transformer Reconditioning - 3T3

Closes 11/20/2026Opened 10/28/2026

City of Richland·Washington

68% match

Tapteal Substation Bank 2 Oil Leak Repair

Closes 11/6/2026Opened 10/1/2026

City of Springfield·Illinois

68% match

Alpha Substation Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

City of Edmond·Oklahoma

67% match

Power Transformers

Closes 11/17/2026Opened 10/12/2026

City of Fort Myers·Florida

67% match

Traffic Signal Painting

Closes 11/6/2026Opened 10/7/2026

LA Water & Power·California

67% match

146852 DS-80 Bank 4 High Side Transformer

Closes 11/6/2026Opened 10/21/2026

City of Edmond·Oklahoma

66% match

Power Transformers

Closes 11/2/2026Opened 10/12/2026

City of Glendale·California

66% match

TRANSFORMER & LTC REPAIR

Closes 11/5/2026Opened 9/22/2026

City of Coronado·California

66% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

City of Salina·Kansas

66% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

County of Sonoma·California

66% match

BID 500 kVA outdoor pad-mounted transformer

Closes 11/6/2026Opened 10/22/2026

University of Maryland - Baltimore·Maryland

66% match

Electrical Substation Expansion and Improvements at Towson University

Closes 12/8/2026Opened 10/28/2026

Vancouver Housing Authority·Washington

66% match

1st Street Apartments Heat Pump Installation

Closes 11/3/2026Opened 9/17/2026

Tacoma·Washington

66% match

Husky Terminal 115KV BABA Transformer

Closes 12/8/2026Opened 10/30/2026

Ohio Department of Natural Resources·Ohio

66% match

PWC S. Construction Electric install new storage building 5TD0

Closes 11/19/2026Opened 10/29/2026

City of Palo Alto·California

66% match

Refurbishment of Existing On Load Tap Changer at Adobe Creek Substation - AC21

Closes 11/3/2026Opened 10/15/2026

City of Spokane·Washington

66% match

Insulation Services; Removal and Replacement of Insulation and Cladding for Boiler Walls and Piping, and Fabrication of and Installation of Removable Insulation Blankets - Prevailing Wage-Unit Price

Closes 11/2/2026Opened 9/2/2026

Utility Board of the City of Key West·Florida

66% match

KEYS Bid 23-26 Specifications for Kennedy Drive Substation Bus Replacement

Closes 11/2/2026Opened 10/1/2026

City of Salina·Kansas

65% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

U.S. Department Of Defense·United States of America

65% match

TRANSFORMER

Closes 11/6/2026Opened 9/25/2026

City of Danville·Virginia

65% match

QB 26-27-016 Swedwood Subtation Package - Bid Tab

Closes 11/8/2026Opened 10/28/2026