The purpose of this Request for Proposal (RFP) is to solicit proposals from potential development partners to design, install, operate, and own a Battery Energy Storage System (BESS) on the California State Polytechnic, San Luis Obispo campus. The BESS is intended to be used to provide peak shaving, with a minimum size of 1 Megawatt, 4 Megawatt hours. The project is being managed by Cal Poly San Luis Obispo, and the RFP documents are available for download on the Public Purchase website. The proposal submission deadline was October 29, 2025, and the shortlisted firms will be announced on November 14th, 2025. Some key points to consider for this project include:
• The BESS must be designed to provide peak shaving capabilities
• The system must be able to operate at a minimum of 1 Megawatt, 4 Megawatt hours
• The project is being managed by Cal Poly San Luis Obispo
• The RFP documents are available for download on the Public Purchase website
• The proposal submission deadline was October 29, 2025