Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Construction
  5. ›Fabrication and Delivery of Floating Dock and Pier

Awarded contract·State of Wyoming·Wyoming

Fabrication and Delivery of Floating Dock and Pier

Single Award
Contract source

Description

The contract is for the fabrication and delivery of a floating dock and pier. The project location is approximately 7.3 miles north of Pinedale, WY. A pre-bid conference was optional and could be scheduled by contacting Miles Anderson. The bid submission deadline was May 29, 2018, at 2:00 PM EDT. The contract documents include a bid package and a pier/dock materials document. • The bid package includes the bid tabs and other relevant information. • The pier/dock materials document provides details about the materials required for the project. • The project requires the fabrication and delivery of a floating dock and pier. • The bid submission process was online through the Public Purchase system. • The contract does not specify the contract value or duration.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Industry
Construction
NAICS
237990
Solicitation №
G&F#8.74.4.2

Similar open opportunities

Matched by Bid Banana AI™

County of Stanislaus·California

Top match · 72%

Turlock Lake State Recreation Dock Replacement

Closes 11/12/2026Opened 10/21/2026

City of Watsonville·California

71% match

Pinto Lake Dock Replacement Project

Closes 11/10/2026Opened 10/2/2026

U.S. Department Of State·United States of America

70% match

Guatemala - Tactical Dock

Closes 12/4/2026Opened 10/22/2026

City of Long Beach·California

70% match

R-7307 Alamitos Bay Berth 1 And 2 Dock Replacement

Closes 11/19/2026Opened 10/8/2026

City of Lake Elsinore·California

69% match

Modular Floating Platforms

Closes 12/1/2026Opened 9/23/2026

City of Melbourne·Florida

68% match

Front Street Boat Dock Repair and Replacement

Closes 11/17/2026Opened 10/9/2026

City of Key West·Florida

68% match

A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina

Closes 11/23/2026Opened 10/15/2026

City of Clermont·Florida

68% match

Meet Us in the Middle Park and Docking Facility Construction

Closes 11/5/2026Opened 8/3/2026

Lake Superior State University·Michigan

68% match

Exterior Dock House with Hydraulic Dock Leveler

Closes 11/6/2026Opened 10/28/2026

U.S. Department Of The Interior·Colorado

68% match

LARO 258755 - Replace Dilapidated Docks and Fuel S

Closes 11/10/2026Opened 9/11/2026

City of St. Petersburg·Florida

68% match

St. Petersburg Pier Pile Repairs

Closes 11/5/2026Opened 10/27/2026

Illinois DNR - Natural Resources·Illinois

68% match

DNR Washington County SRA - Install New Floating Docks

Closes 11/12/2026Opened 10/27/2026

Connecticut Town of Westport·Connecticut

68% match

Compo Marina Piers - Utility Platform

Closes 11/19/2026Opened 10/23/2026

U.S. Department Of Defense·Pennsylvania

67% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

Georgia Chatham Area Transit Authority·Georgia

67% match

CAT PLANT RIVERSIDE FERRY DOCK AND SHELTER

Closes 11/6/2026Opened 10/6/2026

Port of Los Angeles Harbor Department·California

67% match

Pre-Development Agreement Marine Container Terminal Pier 500

Closes 12/10/2026Opened 10/1/2025

Manatee County Port Authority·Florida

66% match

Container Yard Phase 3

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Defense·Pennsylvania

66% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/5/2026Opened 10/6/2026

City of Newport News·Virginia

66% match

Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/9/2026Opened 10/8/2026

Virginia Department of Transportation·Virginia

66% match

IFB 161245 - Sunnybank Ferry Dry Dock; Nthn Neck

Closes 11/4/2026Opened 10/9/2026

U.S. Department Of Homeland Security·Washington

65% match

Dry-Dock: USCG ANT PUGET SOUND (55107) FY27 DD

Closes 11/5/2026Opened 9/25/2026

Town of Highland Beach·Florida

65% match

Marine Access Facility Construction

Closes 11/12/2026Opened 10/9/2026

City of Long Beach·California

65% match

Jib Crane Replacement

Closes 11/19/2026Opened 9/23/2026

County of Accomack·Virginia

65% match

IFB 775 - Parker Creek Dock and Ramp

Closes 11/4/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

65% match

FLOAT ASSEMBLY

Closes 11/6/2026Opened 10/7/2026