The Public Utility District No. 1 of Lewis County is seeking a contractor to provide and supply all planning, engineering, supervision, labor, materials, consumables, equipment, tools, and incidentals required for fabrication, delivery, installation, load testing, and commissioning of two powerhouse bridge cranes at the Cowlitz Falls Hydroelectric Project. The contract includes a base bid for two 5-ton unit bridge cranes and an alternate bid for 7.5-ton units. The contract also includes a sales tax component. The bids submitted by Washington Equipment Manufacturing Company, Inc. and Rognlin's, Inc. are compared in the bid comparison table.
• The contract requires a mandatory pre-submittal meeting.
• The contract includes a bid bond response information form.
• The contract includes various documents, such as the CFP bridge cranes PDF and exhibit F drawings PDF.
• The contract has a sales tax component of 7.80%.