Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Architecture
  5. ›New Allied Health Building, Penn State Mont Alto

Awarded contract·Pennsylvania State University-Main Campus·Pennsylvania

New Allied Health Building, Penn State Mont Alto

Won by Hord Coplan Macht, Inc.$2MAwarded 11/9/2018Single Award
Contract source

Awarded vendors

  • Hord Coplan Macht, Inc.

Description

The Pennsylvania State University awarded the design‑build contract for the New Allied Health Building to Hord Coplan Macht, Inc. The project calls for the design of an approximately 21,000 sf addition (with an optional 3,000 sf OT house addition) to the existing Science & Technology Building at the Mont Alto campus, plus related renovations. The scope includes architectural design, MEP engineering, coordination with a subsequently selected construction manager, and compliance with high‑performance and LEED standards. The selection process was a qualifications‑based competition followed by a formal RFP, site tours, and short‑list interviews. The total project budget is $13 M (construction $9.5 M, soft costs $2.2 M, contingency $1.3 M), with the A/E design portion likely representing a portion of the soft‑cost budget. • Scope: Full‑service A/E design for a 21,000 sf health‑science facility (nursing simulation lab, PT/OT labs, classrooms, student spaces). • Procurement: Open competition; RFP issued Aug 22 2018, proposals due Sep 12 2018, award announced Nov 9 2018. • Vendor: Hord Coplan Macht, Inc., selected as the sole design team; no vendor contact details were disclosed.

Attached files

Key dates

Bids closed
4/3/2024
Intent to award
11/9/2018
Awarded
11/9/2018
Starts
11/9/2018

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Architecture
NAICS
541310

Contract value

$2,000,000

The RFP documents state a total project budget of $13 M, of which $2.2 M is allocated to soft costs (design, consulting, etc.). Since the award is for the architect‑engineer team’s design services only, the contract value is reasonably inferred to be close to the soft‑cost portion. Accounting for typical design‑fee percentages (≈ 8‑12 % of construction cost) and the $9.5 M construction estimate, a design fee would be roughly $750 k‑$1.1 M. Adding other consulting and contingency allowances, a ballpark figure of **$2 million** is a defensible estimate for the A/E contract.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Ferris State University·Michigan

Top match · 66%

Allied Health Renovation Pre-Construction & Construction Management Services

Closes 11/5/2026Opened 10/15/2026

North Carolina Robeson Community College·North Carolina

64% match

Health Care Education Building- New Construction

Closes 12/8/2026Opened 8/31/2026

Oregon Health and Science University·Oregon

62% match

Building commissioning services

Rolling / TBD closeOpened 10/29/2018

The University of Iowa·Iowa

62% match

UI Health Care - John W. Colloton Pavilion - LL - Replace MRI in Room 0457 ID075

Closes 11/10/2026Opened 10/21/2026

State University of New York (SUNY)·New York

61% match

ACP CT Replacement

Closes 12/4/2026Opened 10/13/2026

Eau Claire Cooperative Health·South Carolina

60% match

Cooperative Health Batesburg Leesville Pharmacy Addition

Closes 11/13/2026Opened 10/14/2026

Pennsylvania Department of Health·Pennsylvania

60% match

Pennsylvania Joint Laboratory Facility

Closes 12/25/2026Opened 4/24/2026

Pennsylvania Department of General Services·Pennsylvania

60% match

Rachel Carson Office Building - Interior & HVAC Re

Closes 12/8/2026Opened 10/20/2026

U.S. Department Of Health And Human Services·District of Columbia

60% match

Proactive Health Office (PHO) Mission Office Innovative Solutions Opening (ISO)

Closes 3/5/2029Opened 6/6/2025

New York City Health + Hospitals·New York

59% match

24202204: NCB OTxHU Main Construction

Closes 11/25/2026Opened 10/2/2026

Pennsylvania PA State Sys of Higher Ed·Pennsylvania

59% match

Panera Bread Bakery Cafe Renovation

Closes 11/12/2026Opened 10/12/2026

University of North Dakota·North Dakota

59% match

UND School of Medicine & Health Sciences Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

Oregon Health and Science University·Oregon

59% match

Construction Manager/General Contractor for HRC Infrastructure and Healthcare Program

Rolling / TBD closeOpened 5/5/2021

Pennsylvania Department of Education·Pennsylvania

59% match

Pennsylvania Alternate System of Assessment 2027

Closes 12/15/2026Opened 10/29/2026

Connecticut UConn Health Center·Connecticut

59% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

Penn State University - Office of Physical Plant·Pennsylvania

59% match

UP-FY 18-23 Capital Systems Renewal Program

Rolling / TBD closeOpened 4/11/2026

The University of North Carolina·North Carolina

59% match

Academic Commons Phase 2 - Building Addition

Closes 11/17/2026Opened 10/26/2026

Oregon Health and Science University·Oregon

59% match

ADA assessment

Rolling / TBD closeOpened 8/19/2019

Colorado Pueblo Community College·Colorado

59% match

ADA Upgrades

Closes 12/3/2026Opened 10/30/2026

Oregon South County Health District·Oregon

59% match

Dental Clinic Remodel Project

Closes 11/19/2026Opened 8/31/2026

Oregon Health and Science University·Oregon

59% match

Joint Architectural / Engineering and Construction Manager / General Contractor

Closes 11/3/2026Opened 1/1/2017

City of Philadelphia·Pennsylvania

59% match

1101 Market Street 13th Floor multi upgraded conferencing systems

Closes 11/23/2026Opened 10/21/2026

U.S. Department Of Health And Human Services·District of Columbia

58% match

Scalable Solutions Office (SSO) Mission Office Innovative Solutions Opening (ISO)

Closes 3/5/2029Opened 6/6/2025

Pennsylvania Department of General Services·Pennsylvania

58% match

Rachel Carson Office Building - Interior & HVAC Re

Closes 12/8/2026Opened 10/20/2026

Pennsylvania Department of General Services·Pennsylvania

58% match

Keystone Building - CMS Renovations

Closes 11/10/2026Opened 10/6/2026