The City of Independence, Missouri invited bids for the removal and reinstall of the HVAC Unit on the Operations Building at the Courtney Bend Water Plant. The contract includes all equipment, materials, workmanship, and labor required for the proper removal and reinstall of the HVAC Unit. The awarded vendor is The Waldinger Corporation, with a total price of $60,100.00.
• The contract is for the replacement of a 15 ton Trane Rooftop Packaged Unit or Approved Equal.
• The vendor must provide all labor, equipment, materials, and services required for the complete removal and demo of the existing air handler, ductwork, and installation of the new unit.
• The contract includes the removal and proper disposal of the existing unit, delivery, installation, and start-up services, as well as supplying a set of operating and maintenance manuals in electronic form.
• The bid closing date was October 9th, 2020.
• The contract was awarded based on the low bid meeting specifications.