The contract modernizes the existing Waste Water Treatment Plant at Camp Roberts, California, replacing legacy equipment with a membrane‑bioreactor (MBR) system, associated civil works, and optional upgrades. The scope includes demolition, new concrete and steel foundations, HDPE pipeline installation, electrical and SCADA upgrades, sludge‑handling equipment, and the construction of an optional permeate retention pond, canopy structures, and headworks improvements. The contractor must hold a California Class A or B license plus a C‑22 asbestos abatement license, provide all required bonds and insurance, comply with extensive environmental and safety regulations, and meet small‑business and disabled‑veteran participation goals. The project is a firm‑fixed‑price, 365‑day performance period.
• Replace secondary clarifier with a 250 k‑gpd MBR package plant.
• Provide civil, structural, mechanical, electrical, and control‑system installation.
• Offer four optional alternates (pond, MBR canopy, sludge‑handling canopy, headworks/hardscape).
• Must satisfy California Military Department’s stringent licensing, bonding, and environmental compliance requirements.