The City of Palm Bay has awarded a contract for the North Regional Water Reclamation Facility Process Air Pipe Replacement project. The contract involves the removal and replacement of the damaged process air pipe and appurtenances at the facility. The engineer's estimate for the project is $300,000. The contract was awarded to L7 Construction, Inc. and Florida Design Drilling Corp. The scope of work includes mobilization and demobilization, process air pipe system, civil/site work, building modifications, and electrical and instrumentation work.
• The contract includes a total of 5 items, with prices ranging from $11,000 to $199,000.
• The total bid amount for L7 Construction, Inc. is $271,400, while the total bid amount for Florida Design Drilling Corp. is $274,000.
• The contract documents include a notice of award, a tabulation of bids, and various attachments and specifications.
• A pre-bid conference was held on April 20, 2017, at the Utilities Conference Room in Palm Bay, Florida.