The contract is for the Warm Beach Water System Water Replacement Project, which involves installing approximately 3,550 linear feet of eight-inch ductile iron water main and associated fittings, as well as other related work. The project is funded through the Washington State Drinking Water State Revolving Loan program with federal funds from the Environmental Protection Agency. The contract was awarded to D & G Backhoe Inc. with a bid amount of $880,249.47.
• The project includes installation of new fire hydrant assemblies and appurtenances, combination air vacuum release assemblies, and water services.
• The project also includes asphalt trench patching, asphalt restoration overlay, private asphalt, concrete and gravel driveway removal and restoration, erosion control, and landscape/surface restoration.
• The primary purpose of the project is to replace aging water system infrastructure.
• Construction shall be performed while maintaining service to the existing water system.
• The location of the work is on 188th St. NW, 98th Ave. NW, Clarence Ave., and Soundview Drive, near the City of Stanwood, in Snohomish County, Washington.