This contract calls for the complete design, furnishing, and installation of a new greenhouse at the Applied Technology Center (ATC) of Rock Hill Schools. The vendor must deliver a fully engineered, climate‑controlled structure (30 ft × 84 ft × 8 ft) with polycarbonate panels, HVAC, lighting, irrigation, benches, and ancillary safety equipment, while complying with Davis‑Bacon prevailing‑wage requirements and providing a warranty, training, and all required documentation. Evaluation will be based primarily on cost (50 %), with significant weight given to technical approach (40 %) and references (10 %). The project is funded by the school district and will be awarded to Stuppy Incorporated pending any protests.
• Scope includes structural design, electrical and mechanical systems, interior lighting, fire protection, exit signage, slab design by a SC‑registered engineer, standard greenhouse doors, and a turnkey 12‑zone irrigation system with fertilizer injection.
• Vendor must submit paper proposals (1 original + 3 copies) by 10 a.m. on 30 Oct 2024, and cannot begin work before the effective award date of 27 Nov 2024.
• Addendum 1 (23 Oct 2024) adds interior electrical, lighting, fire extinguisher, exit signage, slab‑design, and irrigation‑system requirements, and confirms Davis‑Bacon coverage.