Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Virginia guideVirginia Bids and Bidding Guide
  • Telecommunications RFPsTelecommunications Bids and Bidding Guide
More telecommunications bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Virginia
  4. ›Telecommunications
  5. ›Installation of Single-Mode Fiber Optic Cable

Awarded contract·Fauquier County·Virginia

Installation of Single-Mode Fiber Optic Cable

Won by Cable Associates, Inc.$2MSingle Award
Contract source

Awarded vendors

  • Cable Associates, Inc.

Description

The Fauquier County Government entered into a fixed‑price contract with Cable Associates, Inc. to install an underground, dark‑fiber, single‑mode, 24‑count fiber‑optic backbone across the county. The work includes utility surveys, permitting, conduit and vault installation, fiber pulling, splicing, testing, and as‑built documentation. The contract runs for four years (30 May 2025 – 9 May 2029) with the possibility of up to five‑year renewal periods if both parties agree. No monetary amount is disclosed in the contract text. • Scope: underground installation of 24‑strand single‑mode fiber, 2‑in. conduit, armored cable, vaults, hand‑holes, splicing, OTDR and attenuation testing, and delivery of as‑built drawings. • Term: 30 May 2025 to 9 May 2029 (4‑year base term) with optional five‑year renewals. • Vendor: Cable Associates, Inc., headquartered at 423 Redoubt Road, Yorktown, VA. • Contract type: Firm‑fixed‑price; performance‑based milestones tied to segment completion dates.

Attached files

Key dates

Starts
5/30/2025
Ends
5/9/2029Renews
Duration
4 years

Last updated

Details

Award type
Single Award
Industry
Telecommunications
NAICS
237130
Solicitation №
25-150-C-R

Contract value

$2,000,000

The contract does not state a dollar amount. Estimating based on typical costs for underground fiber‑optic projects: – Average installed cost for single‑mode, 24‑strand fiber in conduit ranges from $30‑$50 per foot, depending on terrain and civil work. – Assuming a moderate scope of roughly 10 miles (52,800 ft) of fiber (a reasonable size for a county‑wide backbone), the material and installation cost would be approximately $1.6 M – $2.6 M. – Adding design, testing, warranties, and overhead could bring total to roughly $2 M. Therefore a plausible ball‑park value for this four‑year contract is about **$2 million**.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Utility Board of the City of Key West·Florida

Top match · 68%

Specifications for Fiber Optic Services and Materials

Closes 11/6/2026Opened 9/14/2026

Colby Community College·Kansas

68% match

Fiber Installation for Dorm and Maintenance Building (PDF)

Closes 12/1/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

67% match

CABLE,FIBER OPTIC

Closes 11/13/2026Opened 10/27/2026

U.S. Department Of Defense·Arizona

67% match

56 CS FOC to Flightline and Wx Equipment, Luke AFB

Closes 11/9/2026Opened 10/7/2026

Clemson University·South Carolina

66% match

Emergency Cable Repairs

Closes 2/27/2029Opened 3/20/2024

Michigan Caledonia Community Schools·Michigan

66% match

RFP - District Fiber Renovations

Closes 11/20/2026Opened 10/30/2026

Massachusetts Bay Transportation Authority·Massachusetts

66% match

IFB # 133-26: Furnish Fiber Optic Cable

Closes 11/4/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

66% match

60--CABLE,FIBER OPTIC

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

65% match

16--FIBER OPTIC ADAPTER - AND OTHER REPLACEMENT PARTS

Closes 11/9/2026Opened 9/25/2026

Clemson University·South Carolina

65% match

Off Campus Fiber Builds

Closes 6/10/2029Opened 6/13/2024

Oregon Northern Wasco County PUD·Oregon

65% match

RFP No 2026004 Fiber to the Premises (FTTP) Fiber Optic Construction Services

Closes 11/6/2026Opened 10/7/2026

Oregon Confederated Tribes of Siletz Indians·Oregon

64% match

Construction of Outside Plant Fiber Optic Infrastructure PHASE 1

Closes 12/9/2026Opened 10/26/2026

U.S. Department Of Defense·Pennsylvania

64% match

60--CABLE ASSEMBLY,FIBE

Closes 11/25/2026Opened 8/27/2026

Baltimore County, Maryland·Maryland

64% match

Fiber Optic Construction and Related Services

Closes 1/14/2027Opened 10/21/2026

Department of Veterans' Affairs·South Carolina

64% match

Veteran Village - Fire Alarm Control Panel Fiber Install

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·Pennsylvania

63% match

16--FIBER OPTIC ADAPTER - AND OTHER REPLACEMENT PARTS

Closes 11/9/2026Opened 9/25/2026

City of Vallejo·California

63% match

Fleming Hill SCADA Fiber Replacement Project

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Energy·Idaho

63% match

Fiber Dial Room Refurbishment

Closes 12/11/2026Opened 2/25/2026

Palm Beach County Purchasing Department·Florida

63% match

RPQ FIBER OPTIC CABLE, PURCHASE AND DELIVERY, TERM CONTRACT

Closes 3/21/2029Opened 2/5/2024

Palm Beach County·Florida

63% match

PRE-QUAL FOR FIBER OPTIC CABLE

Closes 6/27/2029Opened 1/23/2026

U.S. Department Of Defense·California

63% match

Sources Sought - Modular Fiber Optic Test Platform

Closes 12/12/2026Opened 1/8/2026

Columbia Public Schools·Missouri

63% match

RFP NO C 28006 wan fiber services to various district locations

Closes 11/16/2026Opened 10/12/2026

U.S. Department Of Defense·United States of America

63% match

59--CABLE ASSEMBLY,SPEC

Closes 11/27/2026Opened 10/28/2026

Clemson University·South Carolina

62% match

Twisted Pair and Optical Fiber Cabling

Closes 2/20/2028Opened 3/7/2023

Michigan Wayne-Westland Community School District·Michigan

62% match

DISTRICT FIBER UPGRADES

Closes 11/18/2026Opened 10/16/2026