Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›44th AVENUE PEDESTRIAN/BEAUTIFICATION PROJECT PHASE 2

Awarded contract·County of Sacramento - Construction·California

44th AVENUE PEDESTRIAN/BEAUTIFICATION PROJECT PHASE 2

Won by Central Valley Engineering +5 more$245kMultiple Award
Contract source

Awarded vendors

  • Central Valley Engineering
  • All American Construction
  • B&M Builders
  • Sierra National Construction
  • FBD Vanguard
  • Eagle Builders

Description

The 44th Avenue Pedestrian/Beautification Project Phase 2 involves the furnishing of all labor, materials, and equipment for clearing and grubbing, installation of curb, gutter, sidewalk, ramps, pavement removal, roadway excavation, placement of asphalt concrete, and other incidental work. The project location is on 44th Avenue, with the limits of the project extending from Franklin Boulevard to 39th Street. The estimated construction cost is $279,700.00, and a General Engineering Contractor license is required. The contract was awarded to multiple vendors, with the apparent low bid from Central Valley Engineering. Key aspects of the contract include the scope of work, the estimated construction cost, and the required contractor license. • The scope of work includes clearing and grubbing, installation of curb, gutter, sidewalk, ramps, pavement removal, roadway excavation, placement of asphalt concrete, and other incidental work. • The estimated construction cost is $279,700.00. • A General Engineering Contractor license is required. • The contract was awarded to multiple vendors, with the apparent low bid from Central Valley Engineering. • The project location is on 44th Avenue, with the limits of the project extending from Franklin Boulevard to 39th Street.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
4427

Contract value

$244,886

The estimated construction cost of the project is $279,700.00. However, the apparent low bid from Central Valley Engineering is $244,886.85, which is approximately 12.5% lower than the estimated cost. This suggests that the actual contract value may be lower than the estimated cost. Factors that may influence the contract value include the complexity of the project, the number of bidders, and the level of competition.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

NYS East Fishkill, Town of·New York

Top match · 75%

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

State of Delaware DOT·Delaware

71% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

Municipality of Anchorage·Alaska

70% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Long Beach·California

70% match

R-7298 1st Street Pedestrian Improvements

Closes 11/10/2026Opened 10/7/2026

City of Ontario·California

69% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

LA Public Works Engineering Bureau·California

69% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

City of Coronado·California

69% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Charlotte·North Carolina

69% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

City of San Diego·California

69% match

Gompers Prep 47th St Safety Enhancement

Closes 11/19/2026Opened 10/20/2026

City of Richmond Government·Virginia

69% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Ohio City of Westerville·Ohio

68% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

Maryland State Highway Administration·Maryland

68% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Seattle·Washington

68% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

LA Public Works Engineering Bureau·California

68% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

City of Austin·Texas

68% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

Los Angeles County Public Works·California

68% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

City of Sacramento·California

68% match

Envision Triangle Space

Closes 11/4/2026Opened 10/19/2026

Town of Bluffton·South Carolina

68% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Town of Upton·Wyoming

68% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

City of Keene·New Hampshire

68% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Maryland State Highway Administration·Maryland

68% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

City of Philadelphia·Pennsylvania

67% match

PW Bid 3993ECMS - MPMS 82199 Cottman Ave Redesign with GSI

Closes 12/3/2026Opened 10/16/2026

City of Elk Grove·California

67% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

City of Keene·New Hampshire

67% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

New York City Department of Design and Construction·New York

67% match

85026B0091 - HWX405 - SOUTHERN BOULEVARD BICYCLE AND PEDESTRIAN SAFETY IMPROVEMENTS, THE BRONX

Closes 11/5/2026Opened 5/4/2026