Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Pine Grove Elementary School Chilled Water Piping…

Awarded contract·Hernando County School Board·Florida

Pine Grove Elementary School Chilled Water Piping Replacement

Won by Air Mechanical & Service Corporation$300kSingle Award
Contract source

Awarded vendors

  • Air Mechanical & Service Corporation

Description

The contract is for the replacement of the chilled water piping at Pine Grove Elementary School. The project involves the installation of a new campus-wide chilled water loop. A mandatory pre-bid conference was held on April 10, 2019, at the job site. The contract was awarded to a vendor, but the specific vendor for contract 0252-201-1901 is not mentioned in the provided text. However, for a related contract, Air Mechanical & Service Corporation was selected as the most qualified firm to provide Design-Build Services for the Pine Grove Elementary School HVAC Replacement. The key aspects of the contract include the scope of work, which involves the replacement of the chilled water piping, and the requirement for the vendor to attend the pre-bid conference. • The contract is for the replacement of the chilled water piping at Pine Grove Elementary School. • The project involves the installation of a new campus-wide chilled water loop. • A mandatory pre-bid conference was held on April 10, 2019, at the job site. • The contract was awarded to a vendor, but the specific vendor for contract 0252-201-1901 is not mentioned in the provided text.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Industry
Construction
NAICS
238220
Solicitation №
0252-201-1901

Contract value

$300,000

The value of the contract is not explicitly stated in the provided text. However, based on the scope of work, which involves the replacement of the chilled water piping and the installation of a new campus-wide loop, the contract value could be estimated to be in the range of $100,000 to $500,000. This estimate is rough and based on the assumption that the project is a medium-sized construction project. The actual value of the contract could be higher or lower, depending on various factors such as the complexity of the project, the materials used, and the labor costs.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Santa Maria-Bonita School District·California

Top match · 70%

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

NYS OGS Design & Construction - Construction Contractors·New York

68% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

University of Missouri-Kansas City·Missouri

68% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

Henrico County·Virginia

67% match

Fair Oaks Elementary School Cooling Tower Replacement

Closes 11/17/2026Opened 10/20/2026

Jefferson County Public Schools·Kentucky

66% match

RFP 3200 - C/N for Walk-In Cooler/Freezer Units and Installation for Phase 45 Various Schools

Closes 11/17/2026Opened 10/23/2026

Stafford County Public Schools·Virginia

66% match

Replace Mechanical Systems II at Rocky Run Elementary School

Closes 11/23/2026Opened 10/28/2026

Henrico County Government·Virginia

66% match

ITB No. 26-2999-9EAR - Fair Oaks Elementary School Cooling Tower Replacement

Closes 11/17/2026Opened 10/20/2026

Hillsborough County Public Schools·Florida

65% match

HVAC Water Treatment

Closes 11/30/2026Opened 10/27/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

47690 ELECTRICAL – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Rock Hill School District 3·South Carolina

65% match

Mt. Gallant Chiller Replacement

Closes 11/19/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Omaha Public Schools·Nebraska

65% match

Marrs Cooling Tower Replacement

Closes 12/1/2026Opened 10/26/2026

Maryland Howard County Public Schools·Maryland

65% match

054.27.B3 Harper’s Choice Middle School Chiller & Cooling Tower Replacement

Closes 12/3/2026Opened 10/29/2026

San Gabriel Unified School District·California

65% match

San Gabriel USD - McKinley ES Irrigation Replacement - DIV 01

Rolling / TBD closeOpened 8/4/2026

City of Holly Grove·Arkansas

65% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

Trident Technical College·South Carolina

65% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

Town of Arlington·Massachusetts

64% match

14-02 Peirce School Chiller Project

Rolling / TBD closeOpened 1/30/2014

Greenville County Schools·South Carolina

64% match

HVAC Water Treatment

Closes 11/17/2026Opened 10/23/2026

Virginia Tech·Virginia

64% match

Whitehurst Hall Piping Replacement

Closes 11/13/2026Opened 10/26/2026

Greenville County School District·South Carolina

64% match

HVAC Water Treatment

Closes 11/17/2026Opened 10/23/2026

School District of Philadelphia (General Opportunities)·Pennsylvania

64% match

On Call Plumbing Repairs

Closes 1/12/2027Opened 10/30/2026

Lynwood Unified School District·California

64% match

Abbott Elementary School HVAC Unit Replacement

Closes 11/4/2026Opened 10/1/2026

University of Massachusetts System·Massachusetts

64% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

Virginia Polytechnic Institute and State University·Virginia

64% match

Whitehurst Hall Piping Replacement

Closes 11/13/2026Opened 10/26/2026

Chula Vista Elementary School District·California

63% match

ROOFING REPLACEMENT AT VARIOUS LOCATIONS

Closes 11/18/2026Opened 10/8/2026