The contract is for the replacement of the main electrical line on campus that feeds the main dock at the University of Georgia Skidaway Institute of Oceanography. The project will use the design-bid-build delivery method. A mandatory site visit was held on May 08, 2025, and bidding documents were available through the Jaggaer Sourcing Director online bidding tool. The key aspects of the project include:
• Electrical upgrades to the main dock
• Furnish and install all labor, material, and equipment required for the work
• Completion of all work as described on contract drawings entitled “SKIO DOCK ELECTRICAL UPGRADES”
• A pre-bid conference was held on May 08, 2025, at the UGA Skidaway Institute of Oceanography.