Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Hawaii guideHawaii Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Hawaii
  4. ›Construction
  5. ›Installation of Upgradient Groundwater Monitoring Wells…

Awarded contract·County of Kauai, Department of Finance·Hawaii

Installation of Upgradient Groundwater Monitoring Wells (Rebid IFB 4035)

Won by Valley Well Drilling, LLC$300kSingle Award
Contract source

Awarded vendors

  • Valley Well Drilling, LLC

Description

This contract is for the installation of upgradient groundwater monitoring wells in the County of Kauai. The contract was awarded to Valley Well Drilling, LLC, and the notice of award was sent on June 24, 2025. The contract requires the vendor to provide all materials, labor, transportation, tools, equipment, machinery, and services necessary to construct the wells. The contract also requires the vendor to comply with various regulations and laws, including Act 190, SLH 2011, SB 758. • The contract is for a single award. • The contract is funded by the County of Kauai. • The contract requires the vendor to have a Hawaii State Contractor's License Type "A" or Specialty License C-57. • The contract has a 5% bid bond requirement. • The contract requires the vendor to provide a cashier's check for 5% of the total contract amount within five business days of the notice of award.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
IFB 4044

Contract value

$300,000

The value of this contract is not explicitly stated in the document. However, based on the requirements of the contract, including the installation of upgradient groundwater monitoring wells, it is likely that the contract value is in the range of $100,000 to $500,000. This estimate is based on industry standards for similar projects and the fact that the contract requires a 5% bid bond and a 5% cashier's check.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Veterans Affairs·New Hampshire

Top match · 71%

F108--Groundwater Remediation

Closes 11/12/2026Opened 10/27/2026

California Department of Water Resources·California

67% match

IFB 10222937 Geological Exploration Drilling

Closes 12/9/2026Opened 10/23/2026

City of Oshkosh·Wisconsin

66% match

IFB - REMOVAL/INSTALLATION OF TWO WATER METER TEST BENCHES WITH AMS TECHNOLOGY

Closes 11/10/2026Opened 10/16/2026

Colorado Department of Public Health and Environment·Colorado

65% match

California Gulch Groundwater Monitoring

Closes 11/25/2026Opened 10/23/2026

Hawaii Department of Business, Economic Development and Tourism·Hawaii

65% match

Villages of Kapolei Groundwater Monitoring Services

Closes 11/2/2026Opened 10/1/2026

Colorado Department of Public Health and Environment (CDPHE)·Colorado

65% match

California Gulch Groundwater Monitoring

Closes 11/25/2026Opened 10/22/2026

County of Maui·Hawaii

65% match

Groundwater Deep Monitoring Well at Alaeloa Tank Site [Tk104]

Closes 11/13/2026Opened 10/5/2026

Colorado Department of Public Health and Environment (CDPHE)·Colorado

65% match

California Gulch Groundwater Monitoring

Closes 11/25/2026Opened 10/30/2026

City of Beaumont·California

65% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Catalina Foothills Unified School District·Arizona

65% match

IFB 27-03-32 BACKFLOW-TESTING-MANAGEMENT

Closes 11/5/2026Opened 10/10/2026

Oregon Parks and Recreation Department·Oregon

64% match

ITB #14709 Silver Falls State Park Water Supply Well Replacement

Closes 11/2/2026Opened 9/21/2026

Maryland Frederick County Government·Maryland

64% match

IFB #27-121-CP Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/10/2026

City of Sacramento·California

64% match

Municipal Groundwater Well Drilling Contractors

Closes 11/19/2026Opened 10/29/2026

Massachusetts Town of Pembroke·Massachusetts

64% match

Pembroke Well 4R Implementation

Closes 11/18/2026Opened 10/27/2026

Maryland Carroll County Government - Procurement·Maryland

64% match

IFB Utility System Repair and Replacement Services

Closes 11/18/2026Opened 10/30/2026

Bedford County·Virginia

64% match

(2027-3) IFB: HYBRID FIRE EXTINGUISHING SYSTEM INSTALLATION

Closes 11/9/2026Opened 10/2/2026

Florida Department of Corrections (FDC)·Florida

64% match

Laboratory Analysis on Water Treatment Plants, Wastewater Treatment Plants, and Groundwater Monitor

Closes 8/30/2027Opened 9/30/2026

California Department of Forestry and Fire Protection·California

63% match

IFB 9CA07882 - Underground Electrical Power Infrastructure Installation

Closes 11/18/2026Opened 9/16/2026

Bossier Parish Police Jury·Louisiana

63% match

Goodwill Road at Highway 80 – Well #29 (Well #23 Replacement) – Consolidated Waterworks/Sewerage District No. 1

Closes 11/5/2026Opened 10/7/2026

Hampton Roads Transit·Virginia

63% match

IFB 26-00409R, Veeder Root System Upgrade Project

Closes 11/3/2026Opened 9/22/2026

New Mexico General Services Department·New Mexico

63% match

INSTALLATION AND SERVICE OF WATER SYSTEMS

Closes 11/10/2026Opened 10/1/2026

Prince William County Service Authority·Virginia

63% match

IFB SA 2707 General Sanitary Sewer Cleaning, CCTV, Flow Control-Bypass Pumping, and Hydro-Excavation Work

Closes 11/24/2026Opened 10/20/2026

U.S. Department Of The Interior·New Mexico

63% match

C--BGNDRF PIPING UPGRADES

Closes 11/13/2026Opened 10/7/2026

U.S. Department Of The Interior·Colorado

63% match

INJECTION WELL FAILURE MODE EVALUATION

Closes 11/10/2026Opened 10/13/2026

Prince William County Service Authority·Virginia

63% match

IFB SA 2707-General Sanitary Sewer Cleaning, CCTV, Flow Control-Bypass Pumping and Hydro-Excavation Work

Closes 11/24/2026Opened 10/20/2026