The contract is for the Ballenger McKinney Influent Pumping Station Modifications project, which includes the installation of a low flow pump, piping, valves, instrumentation, controls, SCADA, variable frequency drive, electrical, and structural improvements. The project was awarded to CPP Construction, and the total bid price was $468,000.00. The contract was initiated by the Frederick County Procurement & Contracting Department, and the point of contact is Brian Stieg.
• The project includes the installation of a low flow pump and associated equipment.
• The project requires the contractor to perform structural improvements in the wet well and miscellaneous structural work.
• The contract was awarded to CPP Construction, with a total bid price of $468,000.00.
• The point of contact for the contract is Brian Stieg, who can be reached at (240) 931-8269 or [email protected].