Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Water and Wastewater
  5. ›WATER METER REPLACEMENT AND AUTOMATED METER READING (AMR)…

Awarded contract·The Metropolitan District·Connecticut

WATER METER REPLACEMENT AND AUTOMATED METER READING (AMR) DEPLOYMENT PHASE IV

$5MAwarded 12/23/2016Single Award
Contract source

Description

This solicitation invites qualified firms to submit qualifications and proposals for the replacement of water meters and the installation of automated meter reading (AMR) interface units across the Metropolitan District’s service area. The work includes removal of existing meters, placement of new meters, deployment of meter interface units, and integration with the district’s AMR system. Funding is expected to be partially sourced from the State of Connecticut’s Department of Energy and Environmental Protection and/or the Department of Public Health, and the procurement is subject to state regulations. • Scope: Replace water meters and install AMR interface units for 8 member towns and portions of 4 additional towns. • Funding: Partial state funding; compliance with CT regulations §§22a‑482‑4 (h, j, o). • Process: Open competition with a pre‑proposal conference (Jan 13 2016) and a formal question deadline (Jan 22 2016).

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
2/2/2016
Intent to award
12/23/2016
Awarded
12/23/2016
Starts
12/23/2016

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
2015R-05

Contract value

$5,000,000

The solicitation does not disclose a contract value. Replacing water meters across multiple towns and installing AMR infrastructure typically runs several million dollars. Assuming roughly 100,000 meters at $250 per meter (including labor and equipment) yields $25 million, but state funding and existing infrastructure reduce costs. A conservative estimate places the contract in the $3 million–$7 million range; selecting a midpoint of $5 million provides a reasonable ballpark.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Massachusetts Town of Kingston·Massachusetts

Top match · 75%

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

City of Boca Raton·Florida

74% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Boca Raton·Florida

74% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Aumsville·Oregon

74% match

Automatic Metering Infrastructure Supply & Installation

Closes 11/17/2026Opened 10/20/2026

City of Pasadena·California

74% match

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

City of Charlotte·North Carolina

73% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Punta Gorda·Florida

73% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 11/20/2026Opened 9/25/2026

City of Bedford, TX·Texas

72% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

City of Oshkosh·Wisconsin

72% match

IFB - REMOVAL/INSTALLATION OF TWO WATER METER TEST BENCHES WITH AMS TECHNOLOGY

Closes 11/10/2026Opened 10/16/2026

City of Holly Grove·Arkansas

71% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

Little Blue NRD·Nebraska

71% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

Georgia Jones County Board of Commissioners·Georgia

70% match

Water Meter Change Out-2026

Closes 11/5/2026Opened 9/28/2026

City of Gould·Arkansas

70% match

RFP # 24RU40001 – Contract C – Water Meters

Closes 11/2/2026Opened 10/18/2026

Hilton Head Public Service District·South Carolina

70% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

Arlington County Government·Virginia

70% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

City of Winnebago·Minnesota

70% match

Winnebago, City of Water Meter Replacement BMI Project No. 26X146003

Closes 11/18/2026Opened 10/25/2026

City of Phoenix·Arizona

69% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

Georgia City of Oxford·Georgia

69% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

Metropolitan Council·Minnesota

69% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

LA Water & Power·California

68% match

146628 OWENS LAKE ABB WATERMASTER ELECTROMAGNETIC FLOW METERS

Closes 11/4/2026Opened 10/20/2026

Connecticut Metropolitan District Commission·Connecticut

68% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Washington Suburban Sanitary Commission, MD·Maryland

68% match

Request for Qualification - AMI Materials

Closes 12/11/2026Opened 9/23/2026

U.S. Department Of Veterans Affairs·Washington

68% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

LA County Internal Services Department·California

68% match

WATER METERS HIGH PRESSURE 3 YEAR AGREEMENT

Closes 11/18/2026Opened 10/28/2026

The Metropolitan District·Connecticut

68% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026