The contract is for the replacement of a septic system at 3247 S. Hametown Rd. in Norton, Ohio. The project includes the installation of an NPDES compliant aerobic treatment unit, connection of downspouts, and pump crush and fill of the existing septic system. The contractor must also provide all necessary permits and warranties. The project is subject to Davis Bacon wage rates and requires the contractor to have a minimum of $2,000,000 in general commercial liability insurance and $1,000,000 in commercial auto liability insurance. The winning bidder will enter into a contract with the County of Summit to replace the failing septic system. Some key points to note are:
• The project requires a mandatory pre-bid meeting.
• The contractor must visit the site prior to the pre-bid meeting.
• The contractor must have a current registration, bond, and insurance on file with the appropriate jurisdictions.
• The contractor must carry a minimum of $2,000,000 in general commercial liability insurance and $1,000,000 in commercial auto liability insurance.
• The winning bidder must list the County of Summit as an additional insured on their policy.
• The project is subject to Davis Bacon wage rates.