The University of Akron is seeking bids for the Energy Center Boiler Controls project. The estimated cost of the project is $249,300.00, and the EDGE participation goal is 5% of the contract. The bid submission date was June 18, 2019, at 9:00 AM EDT. The project involves the replacement of boiler controls at the University's energy center.
• The bid tabulation sheet lists Accu-Temp Inc. as a contractor with a base bid of $327,604.00.
• The bid contact is Shandra Irish, who can be reached at (330) 972-5853 or [email protected].
• The University of Akron, Department of Purchasing, is the agency responsible for this bid.
• The project is expected to be completed within a certain timeframe, but the exact duration is not specified.