The contract is for the widening of Hogan Road, including the construction of 18" and 12" water mains. The project involves the excavation of the existing road, the construction of a new road with a 10' sidewalk, and the installation of water mains. The contract includes various bid items, such as unclassified roadway earthwork, cement stabilized subgrade, HMAC, and concrete curb and gutter. The contract also includes storm sewer improvements, water improvements, and sanitary sewer improvements. The bidders for the contract include Capital Excavation Co., Holy Conttractors, LLC, James Construction Group, LLC, Lone Star Grading & Materials, LLC, McLean Construction, Inc., R.T. Schneider Construction Co, Ltd., and TTG Utilities, LP.
Some key points from the bid tabulation include:
- The total base bid for the project ranges from $3,178,641.73 to $4,825,751.00 among the bidders.
- The total alternate bid for the project ranges from $38,150.00 to $123,480.00 among the bidders.
- The unit costs for the various bid items vary among the bidders, with some items having a unit cost of $0.00.
- The contract includes a pre-bid conference and a bid submission date.
- The contract also includes various documents, such as specifications, drawings, and addendums.
Overall, the contract appears to be for a significant infrastructure project in the City of Temple, Texas, with multiple bidders and a range of bid prices.