This contract is for professional engineering services related to the FM 2551 project, including the analysis of an existing detention basin and the submission of a technical memorandum discussing the FM 2551 stormwater runoff and the detention basin volume. The contract has undergone several amendments, with the total contract amount increasing to $2,751,468.00. The contract was awarded to CP&Y, Inc. d/b/a STV Infrastructure. Key aspects of the contract include:
• The contract is for professional engineering services
• The project involves the analysis of an existing detention basin and the submission of a technical memorandum
• The contract has undergone several amendments
• The total contract amount is $2,751,468.00
• The contract was awarded to CP&Y, Inc. d/b/a STV Infrastructure