The contract is for the AC Overlay Project SB1 2021 Phase 2, which involves repairing deteriorated pavement sections, placing a conventional or rubberized asphalt concrete overlay or slurry seal, installing Americans with Disabilities Act (ADA) curb ramps, restriping the roadway, and other improvements. The contract was awarded to Goodfellow Bros. California, LLC, with a total bid of $6,803,887.00. The project is expected to be completed in October 2022. Key aspects of the project include:
• Pavement rehabilitation
• Installation of ADA curb ramps
• Restriping of the roadway
• Other improvements necessary to complete the overlay
The contract documents, including the bid proposal and addenda, provide detailed information about the project scope, bid requirements, and contract terms.