The contract is for HVAC upgrades at City Hall, specifically for Phase 1. The work includes refurbishing two existing air handling units, AHU S2 and AHU S5, which serve the lower level basement and four levels of the building. The contract was awarded to Johansen Mechanical Inc. with a bid price of $186,257.15. The project manager is Emma Johnson, and the engineer's estimate for the project is $210,000.00. The scope of work includes mechanical and hydronic work, as well as controls integration into the existing DDC system.
• The contract is for a single phase of the project
• The work includes refurbishing two existing air handling units
• The contract was awarded to Johansen Mechanical Inc.
• The project manager is Emma Johnson
• The engineer's estimate for the project is $210,000.00