The City of Bellevue is seeking bids for the 2020 AC Water Main Replacement Phase 3 project. The project involves constructing approximately 4,060 LF of ductile iron water mains, installing new fire hydrant assemblies and water sampling station assembly, installing water services, relocating existing utilities, removing asbestos cement pipe, restoring surface conditions, and performing traffic control. The engineer's estimate for the project is $1,670,977.00. The contract was bid on by several vendors, but the document does not specify which vendor was awarded the contract.
• The project involves water main replacement and installation of new fire hydrant assemblies and water sampling station assembly
• The project requires relocating existing utilities and removing asbestos cement pipe
• The project involves restoring surface conditions and performing traffic control
• The engineer's estimate for the project is $1,670,977.00
• The contract was bid on by several vendors, including Pivetta Brother Construction, Kar-Vel Construction, and Rodarte Construction