This contract concerns the removal of two existing rooftop HVAC units at Manchester High School and the installation of two new units (one 15‑ton and one 20‑ton) with full building‑automation and fire‑alarm integration. The scope includes refrigerant reclamation, electrical and gas‑piping reconnections, start‑up, testing, and a one‑year warranty on materials and workmanship. The project must be completed by June 30 2021 and is subject to Connecticut living‑wage requirements if the contract value exceeds $25,000. Key points:
• Complete demolition, disposal, and replacement of two rooftop heating/cooling units, including BACnet‑compatible controls.
• Coordination with school operations, strict safety/barricade requirements, and multiple inspections per the Connecticut Basic Building Code.
• No performance or payment bonds required; town permit fees waived; vendor must provide tax‑exempt certification and possibly comply with prevailing‑wage rules.