The City of Independence, Missouri is soliciting bids for the replacement of potable and non-potable water site piping at the Rock Creek Wastewater Treatment Plant. The bid includes the replacement of existing piping with new piping based on 6” DIP and 4” DIP specifications. The bid also includes change order items such as 6” DIP 90 Degree Bend w/ restraint, 6” DIP Tee w/ restraint, and Fire Hydrant. The contract was awarded to Pyramid Excavation & Construction, Inc. and Central Plumbing. The total bid price for Pyramid Excavation & Construction, Inc. is $721,280.00, and the total bid price for Central Plumbing is $655,755.00.
• The bid includes the replacement of potable and non-potable water site piping
• The bid includes change order items such as 6” DIP 90 Degree Bend w/ restraint and Fire Hydrant
• The contract was awarded to Pyramid Excavation & Construction, Inc. and Central Plumbing
• The total bid price for Pyramid Excavation & Construction, Inc. is $721,280.00
• The total bid price for Central Plumbing is $655,755.00