The Decker Main WWPS Emergency Repairs project consists of removing the header piping and knife gate valves, force main rehab, new pipe installation, and bypass setup. The project is located at the Decker Main Wastewater Pump Station site in West Valley, Utah. The contract was awarded to Carrio Construction, Inc., Whitaker Construction, Inc., and VanCon, Inc. The engineer's estimate for the project is $500,000.
• The project involves the removal and disposal of existing header and knife gate valves.
• The project involves the installation of a new 24-inch and 30-inch header and two new knife gate valves.
• The project involves force main pipe rehabilitation.
• The project involves bypass pumping.
• The project involves mobilization and demobilization.