The Fermi Forward Discovery Group, LLC is seeking a contractor to supply, install, and test a stainless-steel pipeline for the transportation of Argon gas at the LBNF facility. The pipeline will be approximately 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC. The contractor will be responsible for the supply, installation, and testing of the pipeline.
• The pipeline will be used to transport approximately 40,000 metric tons of Argon from the surface to the Central Utility Cavern (CUC) at the 4850 Level.
• The Argon will arrive at the Ross Shaft Argon Receiving station in liquid form and will be converted to the gaseous phase before being transported underground through the pipeline.
• The contractor must acknowledge the amendment to the solicitation prior to the proposal due date.
• The proposal due date is July 27, 2026, at 5:00pm MT.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.