The Town of Brighton is seeking proposals from qualified contractors to install a new cold-climate heat pump system that will cover the occupied space in the Town Garage. The existing boiler system/wood stove will be retained to provide ambient temperature control with the heat pump system serving as the primary heating and only cooling option. The project also includes the installation of remotely accessible, fully programmable thermostats for both the heat pump and existing hot water systems. The selected contractor will be responsible for providing and installing the heat pump system, thermostats, and other necessary equipment. The project is expected to start in Spring/Summer 2026 and be completed by September 30, 2026.
Key aspects of the project include:
* Installation of a cold-climate heat pump system
* Installation of remotely accessible, fully programmable thermostats
* Retention of the existing boiler system/wood stove for ambient temperature control
* Compliance with NFPA 70, Vermont State Building and Electrical Codes, and manufacturer specifications
* Provision of a comprehensive warranty for the installed systems and equipment
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.