Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Engineering Services
  5. ›Swamp Rabbit Trail Orange Line Connection Feasibility Study

Upstate Greenways and Trails Alliance·South Carolina

Swamp Rabbit Trail Orange Line Connection Feasibility Study

Closes 10/23/2026$100k – $250kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Upstate Greenways and Trails Alliance (UGATA) seeks a qualified firm to conduct a feasibility study for a Shared Use Path that would connect the Green Line and Orange Line segments of the Swamp Rabbit Trail. The selected contractor will evaluate two potential route alternatives, assess engineering and environmental constraints, develop cost estimates, outline permitting requirements, and propose an implementation timeline. This study will guide UGATA’s decision‑making on whether and how to proceed with the trail connection. • Scope includes route alignment analysis, cost‑benefit evaluation, permitting strategy, and schedule development. • Deliverables: feasibility report, preliminary cost estimates, recommended alignment, and a phased implementation plan. • Project follows a Design‑Bid‑Build delivery method, with the feasibility study serving as the preliminary planning phase.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sam Davis(Agency Project Coordinator)

[email protected]

(205) 873-3853

Key dates

Opened
9/21/2026
Closes
10/23/2026
Duration
3 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330

Budget estimate

$100,000 – $250,000

Based on similar municipal trail feasibility studies, a professional services firm can expect a fee ranging from $100,000 for a basic evaluation to $250,000 for a comprehensive study that includes detailed cost modeling, environmental review, and phased implementation planning. The estimate accounts for the project's scope (two route alternatives), the need for engineering and permitting expertise, and the geographic location (South Carolina).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Gainesville - Procurement Division·Florida

Top match · 63%

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Oak Manor Municipal Utility District·Texas

62% match

Waterline Rehabilitation along Oak Trail, Oak Manor Drive, & Shady Oak Court

Closes 11/5/2026Opened 10/23/2026

Delaware Valley Regional Planning Commission·Pennsylvania

61% match

Feasibility Study for Naylor's Run and Pennsy Trails (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 11/13/2026Opened 10/5/2026

Open Space Institute·South Carolina

60% match

Meadows Boardwalk Trail Number

Closes 11/16/2026Opened 10/29/2026

Harris County·Georgia

60% match

Man-O-War Trail, Phase VI

Closes 1/18/2027Opened 12/5/2022

Virginia Department of Transportation·Virginia

60% match

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

City of Rogers·Arkansas

60% match

Request for Letters of Interest – US‑71B Corridor Study & Railyard Loop Trail Undercrossing Feasibility Studies

Closes 11/3/2026Opened 10/11/2026

City of Gaithersburg·Maryland

60% match

Construction Services for Rabbitt Road Stream and Vegetative Buffer Restoration

Closes 11/9/2026Opened 9/15/2026

City of Green Cove Springs·Florida

60% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Alaska Department of Transportation & Public Facilities·Alaska

60% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

Pierce County·Washington

59% match

Orangegate Park Phase 1 Site Improvements

Closes 11/10/2026Opened 10/7/2026

Catawba Regional Council of Governments·South Carolina

59% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Georgia Cobb County Department of Transportation·Georgia

59% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Environmental Conservation, NYS Department of·New York

59% match

2027 Cold River Horse Trail Backcountry Maintenance

Closes 11/18/2026Opened 10/14/2026

New Orleans Regional Transit Authority·Louisiana

59% match

Tree Cutting Streetcar Line & Vegetation Clearance

Closes 11/17/2026Opened 10/15/2026

City of Charlotte·North Carolina

59% match

Sewer Trunkline Modeling

Rolling / TBD closeOpened 7/1/2026

Cobb County·Georgia

59% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Open Space Institute·South Carolina

59% match

The Meadows Boardwalk Trail Project

Closes 11/13/2026Opened 10/23/2026

Howard County, Office of Procurement·Maryland

59% match

Patuxent Branch Trail Improvements

Closes 12/23/2026Opened 10/23/2026

City of Middletown·Connecticut

59% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

Pierce County·Washington

59% match

Pipeline Trail Phase 3 - Architecture and Engineering Services

Closes 11/20/2026Opened 10/30/2026

City of Rogers·Arkansas

58% match

SS4A US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies Request for Letters of Interest

Closes 11/3/2026Opened 10/11/2026

City of Charlotte·North Carolina

58% match

Mt Holly-Huntersville Road Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

City of Keene·New Hampshire

58% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

County of Amherst·Virginia

58% match

Route 130 & 210 Water Line

Closes 11/19/2026Opened 9/28/2026