The City of Dunwoody is soliciting proposals for the removal and replacement of the existing Pour-In-Place (PIP) playground safety surface at Windwood Hollow Park. The project includes demolition of the existing PIP surface, installation of a new PIP system, removal of existing plastic playground borders, and installation of new concrete curbing. The contractor must have a minimum of 5 years of experience installing PIP playground surfacing and provide references for at least three similar projects completed within the last five years.
• The project location is Windwood Hollow Park, 4865 Lakeside Drive, Dunwoody, GA 30360.
• The approximate surface area is 6,750 square feet.
• The existing PIP surface must be removed and replaced with a new PIP system meeting or exceeding ASTM, CPSC, and ADA requirements.
• The contractor must conduct field testing upon completion and provide written certification of compliance.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.